James Enright
- Listed as
- engineer
- Firm
- Jt Structural
- Based in
- San Francisco
- On San Francisco permits
- Mar 2025 to Jun 2026
7 permits since 2000 (engineer on 7 permits): 1 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 647 11th Av | Caruso Construction Inc. | revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entrywayDetails
revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entryway | |
| May 1, 2026 | In progress issued Jul 2026 | 3647 Washington St | Mcguinness Mccann Group | strengthening of a short existing site retaining wall that runs perpendicular to the east property line. near the entrance to the residence.Details
strengthening of a short existing site retaining wall that runs perpendicular to the east property line. near the entrance to the residence. | $5,000 |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 49 Oliver St | proposed child care facility that includes: conversion of garage into a child play area, convervsion of bedroom 2&3 into 1 big room, conversion of bedroom 1 into an isolation room with lavatory, conversion of entertainment room into indoor art room, conversion of detached storage into outdoor art..Details
proposed child care facility that includes: conversion of garage into a child play area, convervsion of bedroom 2&3 into 1 big room, conversion of bedroom 1 into an isolation room with lavatory, conversion of entertainment room into indoor art room, conversion of detached storage into outdoor art.. | $120,000 | |
| Feb 4, 2026 | In progress filed Feb 2026, not yet issued | 103 Park St | exterior stair replaced in-kind.Details
exterior stair replaced in-kind. | $30,000 | |
| Dec 30, 2025 | In progress issued Apr 2026 | 647 11th Av | Caruso Construction Inc. | 2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fronDetails
2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fron | $150,000 |
| Aug 21, 2025 | In progress issued Aug 2025 | 738 22nd Av | Krueger Bros Builders Inc., Mark Scott Construction Inc | rehabilitation & reconstruction of a residential house damaged by fire. 1st floor: replace existing window, existing doors, existing gypboard, build up cabinets, existing wood lap. 2nd fl.: replace existing windows, existing doors, existing toilets, existing cabinets, floor ceiling, wood lap siding.Details
rehabilitation & reconstruction of a residential house damaged by fire. 1st floor: replace existing window, existing doors, existing gypboard, build up cabinets, existing wood lap. 2nd fl.: replace existing windows, existing doors, existing toilets, existing cabinets, floor ceiling, wood lap siding. | $300,000 |
| Mar 11, 2025 | Completed final sign-off Dec 2025 | 2225 21st Av | R Magday Builders Inc | 1st flr- remove and relocate water heater (washer/dryer/demo stair leading to 2nd floor. 2nd floor to remove portion of (e) hallay and wall between nook and kitchen. remove closet between kitchen and master bedroom. remodel kitchen and bathroom. reroof over (e) airwell and bathroom and over (e)Details
1st flr- remove and relocate water heater (washer/dryer/demo stair leading to 2nd floor. 2nd floor to remove portion of (e) hallay and wall between nook and kitchen. remove closet between kitchen and master bedroom. remodel kitchen and bathroom. reroof over (e) airwell and bathroom and over (e) | $150,000 |