Ian Matthew Kucma
- License
- M33760
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M33760 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- O + A
- On San Francisco permits
- May 2014 to Feb 2018
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Air Systems, Inc. (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2018 | Expired or cancelled cancelled Jan 2026 | 425 Market St | Air Systems, Inc. | 11/f: install supply air ducts to existing unit. maher naDetails
11/f: install supply air ducts to existing unit. maher na | $5,000 |
| May 1, 2014 | Completed final sign-off Sep 2014 | 120 Kearny St | Air Systems, Inc. | 19th and 20th floor.low pressure ductwork and heating hot water piping. relocate 40 boxes, low pressure pneumatic vav boexes. 26 boxes with reheat coils and new hot water reheat coil connectors for exterior places and large meeting places. 14 cooling only boxes, 4 new water source heat pumpsDetails
19th and 20th floor.low pressure ductwork and heating hot water piping. relocate 40 boxes, low pressure pneumatic vav boexes. 26 boxes with reheat coils and new hot water reheat coil connectors for exterior places and large meeting places. 14 cooling only boxes, 4 new water source heat pumps | $637,594 |