Howard Austin Lasseter
- License
- C16961
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C16961 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Howard Austin Lasseter Arch
- Based in
- Oakland
- On San Francisco permits
- Jan 2012 to Jan 2017
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Alward Const. Co Inc A Ca Corp, Palm Construction
- Engineers
- Jahandar Yadegar
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2017 | Completed final sign-off Jul 2018 | 1511 Dolores St | add 60 sq.ft. to 2nd story & change lower story roof to a deck. remodel a bathroom & closet.Details
add 60 sq.ft. to 2nd story & change lower story roof to a deck. remodel a bathroom & closet. | $75,000 | |
| May 12, 2016 | Completed final sign-off Mar 2017 | 1511 Dolores St | revision to ref pa 2015 1210 4734: omit steel beams, reframe rear wall & roof of room at rear. repair & refinish stair as necessary. add warm floors at rear room & bathDetails
revision to ref pa 2015 1210 4734: omit steel beams, reframe rear wall & roof of room at rear. repair & refinish stair as necessary. add warm floors at rear room & bath | ||
| Aug 15, 2014 | Completed final sign-off Jan 2016 | 507 Belvedere St | Palm Construction | demo (e) bathroom, install new bathroom in same spaceDetails
demo (e) bathroom, install new bathroom in same space | $37,000 |
| Jan 19, 2012 | Never finaled issued Jan 2012, no final | 47 Ford St | Alward Const. Co Inc A Ca Corp | remodel 1 bathroom & 1 power room, no work to existing structural framing or exterior walls. replace existing glazing w/tempered glass in existing window frame in existing lightwell.Details
remodel 1 bathroom & 1 power room, no work to existing structural framing or exterior walls. replace existing glazing w/tempered glass in existing window frame in existing lightwell. | $34,000 |