Howard Austin Lasseter
- Listed as
- architect, engineer
- Firm
- Howard Austin Lasseter Arch
- Based in
- Oakland
- On San Francisco permits
- Jan 2012 to Jan 2017
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2017 | Completed final sign-off Jul 2018 | 1511 Dolores St | add 60 sq.ft. to 2nd story & change lower story roof to a deck. remodel a bathroom & closet.Details
add 60 sq.ft. to 2nd story & change lower story roof to a deck. remodel a bathroom & closet. | $75,000 | |
| May 12, 2016 | Completed final sign-off Mar 2017 | 1511 Dolores St | revision to ref pa 2015 1210 4734: omit steel beams, reframe rear wall & roof of room at rear. repair & refinish stair as necessary. add warm floors at rear room & bathDetails
revision to ref pa 2015 1210 4734: omit steel beams, reframe rear wall & roof of room at rear. repair & refinish stair as necessary. add warm floors at rear room & bath | ||
| Aug 15, 2014 | Completed final sign-off Jan 2016 | 507 Belvedere St | Palm Construction | demo (e) bathroom, install new bathroom in same spaceDetails
demo (e) bathroom, install new bathroom in same space | $37,000 |
| Jan 19, 2012 | Never finaled issued Jan 2012, no final | 47 Ford St | Alward Const. Co Inc A Ca Corp | remodel 1 bathroom & 1 power room, no work to existing structural framing or exterior walls. replace existing glazing w/tempered glass in existing window frame in existing lightwell.Details
remodel 1 bathroom & 1 power room, no work to existing structural framing or exterior walls. replace existing glazing w/tempered glass in existing window frame in existing lightwell. | $34,000 |