Horan Lee
- License
- S63818
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S63818 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Jun 2008 to Feb 2022
4 permits since 2000 (architect on 2 permits, engineer on 2 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bay C T Construction Inc., Cw Cheng Construction Co, Green City Construction Inc
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2022 | Completed final sign-off Oct 2022 | 149 03rd Av | Green City Construction Inc | revision to pa#202105210774 with as buid plans and add a new rear deck.Details
revision to pa#202105210774 with as buid plans and add a new rear deck. | $5,000 |
| Jun 16, 2021 | Completed final sign-off Nov 2022 | 148 Huntington Dr | Cw Cheng Construction Co | convert e 1st fl garage area to living rm, 1 bdrm, 1 bath, 1 powder room. 2nd fl remodel kitchen and add 1 bath, remove fireplace and add 4 skylights.Details
convert e 1st fl garage area to living rm, 1 bdrm, 1 bath, 1 powder room. 2nd fl remodel kitchen and add 1 bath, remove fireplace and add 4 skylights. | $120,000 |
| Jan 7, 2010 | Completed final sign-off Sep 2010 | 766 Clayton St | Bay C T Construction Inc. | revision to pa# 2009.10.21.9411. 1st fl: replace wall/ceiling,bath fixtures and relocate kitchen; basement: remove columns for additinal prkg spaces, replace foundation, add new master bedroom and bath room. all work shown on delta 1, dated 12.07.09Details
revision to pa# 2009.10.21.9411. 1st fl: replace wall/ceiling,bath fixtures and relocate kitchen; basement: remove columns for additinal prkg spaces, replace foundation, add new master bedroom and bath room. all work shown on delta 1, dated 12.07.09 | $120,000 |
| Jun 30, 2008 | Completed final sign-off Oct 2008 | 1730 Pacheco St | new deck on 2nd floor rear and new 8x6 patio door.Details
new deck on 2nd floor rear and new 8x6 patio door. | $10,000 |