Henry Hyde
- Listed as
- engineer
- Firm
- Hyde Renewables
- On San Francisco permits
- Aug 2024 to Aug 2024
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2024 | In progress issued Nov 2024 | 1990 Lombard St | Upscale Construction Inc. | business ti interior remodel and accessibility upgrade at office space @ 2nd level within existing building. (n) windows at 2nd level to replace existing in same location. no structural work. (n) windows are aluminum-clad wood.Details
business ti interior remodel and accessibility upgrade at office space @ 2nd level within existing building. (n) windows at 2nd level to replace existing in same location. no structural work. (n) windows are aluminum-clad wood. | $178,800 |