Harold Howell
- Listed as
- engineer
- Firm
- Mercury Engineering Group
- On San Francisco permits
- May 2005 to Aug 2017
7 permits since 2000 (engineer on 7 permits): 1 completed, 1 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2017 | Expired or cancelled cancelled Jul 2026 | 2300 Chestnut St | Flatbread Inc Dba Greentree Design Build, S F Garage Company Inc. | addition of new wall & new coffee bar at the 1st floor restaurant.Details
addition of new wall & new coffee bar at the 1st floor restaurant. | $30,000 |
| Apr 26, 2017 | Expired or cancelled expired Dec 2024 | 376 Union St | S F Garage Company Inc. | facade change. replace existing 1st floor windows with new glass door and new windowDetails
facade change. replace existing 1st floor windows with new glass door and new window | $5,000 |
| Dec 12, 2014 | Expired or cancelled withdrawn Apr 2015 | 3042 California St | convert (e) storage to (n) garage, demo existing wall at front of building to install (n) garage door with (n) moment frame, fire sprinkler on separate permit. (n) pre foundation constructed per pa# 201408284931Details
convert (e) storage to (n) garage, demo existing wall at front of building to install (n) garage door with (n) moment frame, fire sprinkler on separate permit. (n) pre foundation constructed per pa# 201408284931 | $20,000 | |
| Aug 26, 2014 | Expired or cancelled expired Feb 2018 | 969 Pine St | S F Garage Company Inc. | structural upgrade: install shear wall per soft story ordinance. per sfbc chapter 34b. replace extg rerimeter brick foundation with new concrete footing. 2012 iebc appendix a4Details
structural upgrade: install shear wall per soft story ordinance. per sfbc chapter 34b. replace extg rerimeter brick foundation with new concrete footing. 2012 iebc appendix a4 | $30,000 |
| Mar 14, 2014 | Never finaled issued Mar 2014, no final | 310 Columbus Av | 3rd floor- repair & re-arrange bathroom. convert 2 (e) bathroom to (n) ada bathroom on room 238 & 239 on 3rd floor. & remodel 8 bathrooms. t-24 or occupancy sensor on all lights.Details
3rd floor- repair & re-arrange bathroom. convert 2 (e) bathroom to (n) ada bathroom on room 238 & 239 on 3rd floor. & remodel 8 bathrooms. t-24 or occupancy sensor on all lights. | $50,000 | |
| Dec 22, 2010 | Completed final sign-off Jan 2011 | 156 Vicksburg St | S F Garage Company Inc. | revision to app#201012096420 - no structural work. to document prop line rear west side of bldg.Details
revision to app#201012096420 - no structural work. to document prop line rear west side of bldg. | |
| May 6, 2005 | Expired or cancelled expired Nov 2006 | 3723 Sacramento St | install structural upgrades according to plans by mercury engineering dated 4/29/05.Details
install structural upgrades according to plans by mercury engineering dated 4/29/05. | $25,000 |