Hamid Panahi
- License
- C31146
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Sep 2021 to Apr 2025
4 permits since 2000 (architect on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D Squared Construction (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 11, 2025 | Completed final sign-off Jul 2025 | 550 15th St | no construction, change of planning use in tenant space from general to night time entertainment and to change of building code use from a3 (assembly use without food or drink consumption) to a2 (nightclub with food and drink consumption).Details
no construction, change of planning use in tenant space from general to night time entertainment and to change of building code use from a3 (assembly use without food or drink consumption) to a2 (nightclub with food and drink consumption). | ||
| Apr 3, 2024 | In progress filed Apr 2024, not yet issued | 360 Ritch St | D Squared Construction | accessible entrance complience per abe #201812173044 (push button)Details
accessible entrance complience per abe #201812173044 (push button) | $1,800 |
| Mar 21, 2024 | In progress filed Mar 2024, not yet issued | 189 13th St | making business entrance accessible. abe 201812173097. level landings, power door operator, anchor in place doormatDetails
making business entrance accessible. abe 201812173097. level landings, power door operator, anchor in place doormat | ||
| Sep 30, 2021 | Completed final sign-off Jun 2022 | 430 Burnett Av | D Squared Construction | apt# 10 - repair and restore fire damages, drywall, electrical fixtures, replace sink, tub toilets.Details
apt# 10 - repair and restore fire damages, drywall, electrical fixtures, replace sink, tub toilets. | $41,000 |