Geronimo Daliv
- Listed as
- architect, engineer
- On San Francisco permits
- Apr 2024 to Aug 2026
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 3739 Geary Bl | 1/f: to add a non-bracing wall 4'11" x 15' x 14'high. add a new door in main entrance.Details
1/f: to add a non-bracing wall 4'11" x 15' x 14'high. add a new door in main entrance. | $10,000 | |
| Dec 4, 2025 | In progress issued Dec 2025 | 631 Haight St | demo cabinets on first floor by ada bathroom, close off sink sewer. repair of stairs front less that 50% replace repair to comply with nov #201880162, item#2.Details
demo cabinets on first floor by ada bathroom, close off sink sewer. repair of stairs front less that 50% replace repair to comply with nov #201880162, item#2. | $1,000 | |
| Apr 23, 2024 | Completed final sign-off Jul 2024 | 478 36th Av | Pacific Construction Company Inc | remove and replace (e) 4.6 ft retaining wall at the back right side of property and add a (n) 6 ft wood fence on top of the (n) retaining wall. the length of the fence and wall will be 22 linear feet. total height of wall and fence will be 10.6ftDetails
remove and replace (e) 4.6 ft retaining wall at the back right side of property and add a (n) 6 ft wood fence on top of the (n) retaining wall. the length of the fence and wall will be 22 linear feet. total height of wall and fence will be 10.6ft | $30,000 |