George Dedekia Architect
- License
- C10260
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C10260 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Oct 2004 to Nov 2018
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Flory Construction, Inc. (3), Steelcore Builders Inc
- Engineers
- Michael Kaszpurenko
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2018 | Completed final sign-off Jan 2020 | 298 Gough St | Steelcore Builders Inc | (e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroomDetails
(e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroom | $200,000 |
| Jun 9, 2005 | Completed final sign-off Oct 2005 | 3301 Lyon St | Flory Construction, Inc. | revise plan changes in theater area: (1) door size change (2) accessible seatingDetails
revise plan changes in theater area: (1) door size change (2) accessible seating | |
| Dec 21, 2004 | Completed final sign-off Oct 2005 | 3301 Lyon St | Flory Construction, Inc. | voluntary barrier removal, revise the seating area for wheel chair access & handrails to code.Details
voluntary barrier removal, revise the seating area for wheel chair access & handrails to code. | $20,000 |
| Oct 29, 2004 | Completed final sign-off Oct 2005 | 3301 Lyon St | Flory Construction, Inc. | voluntary barrier removal. all non structural-upgrade @ (e) bathrooms barier removal.Details
voluntary barrier removal. all non structural-upgrade @ (e) bathrooms barier removal. | $2,500 |