Gary Millar
- Listed as
- architect, authorized agent-others
- Firm
- Millar Architecture
- Based in
- San Anselmo
- On San Francisco permits
- Apr 2001 to Aug 2019
6 permits since 2000 (architect on 4 permits, authorized agent-others on 2 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Nov 2019 | 37 West Clay St | T N T Construction | kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visibleDetails
kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visible | $80,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 572 04th Av | T N T Construction | install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom.Details
install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom. | $30,000 |
| Mar 11, 2008 | Completed final sign-off Dec 2008 | 136 Jordan Av | interior remodel of 2nd story-(4 windows at front), 2nd story replace single glazed windows with insulated glass windows. remodel master bathroom and 2nd bathroom in their (e) location. renovate (e) stair to 3rd floor to provide code complying headroom, rise and run and widthDetails
interior remodel of 2nd story-(4 windows at front), 2nd story replace single glazed windows with insulated glass windows. remodel master bathroom and 2nd bathroom in their (e) location. renovate (e) stair to 3rd floor to provide code complying headroom, rise and run and width | $175,000 | |
| Mar 16, 2007 | Completed final sign-off Oct 2008 | 572 04th Av | T N T Construction | addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath.Details
addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath. | $225,000 |
| Nov 15, 2005 | Expired or cancelled expired Jan 2009 | 37 West Clay St | Mayta & Jensen | renewal pa 200104045988s for final inspection.Details
renewal pa 200104045988s for final inspection. | |
| Apr 4, 2001 | Never finaled issued Dec 2003, no final | 37 West Clay St | third story addition-basement improvements to provide 8 ft head room, new foundation, addition of baDetails
third story addition-basement improvements to provide 8 ft head room, new foundation, addition of ba | $150,000 |