Bobby Haviv Avittal
- Listed as
- authorized agent-others, contractor
- Firm
- Room By Room Maintenance Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Dec 2021
30 permits since 2000 (contractor on 30 permits, authorized agent-others on 1 permit): 23 completed, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2021 | Completed final sign-off May 2022 | 1415 San Bruno Av | Room By Room Maintenance Inc | structural strengthening to (e) garage level by eliminating the wooden post and overhead beam with steel beam per plan.Details
structural strengthening to (e) garage level by eliminating the wooden post and overhead beam with steel beam per plan. | $8,000 |
| Oct 7, 2021 | Completed final sign-off Jun 2022 | 1354 Florida St | Room By Room Maintenance Inc | response to nov 202182136. to renew expired pa #200008117630, pa #200006031699 and pa #200004187543. for final only.Details
response to nov 202182136. to renew expired pa #200008117630, pa #200006031699 and pa #200004187543. for final only. | |
| Sep 28, 2021 | Completed final sign-off Nov 2021 | 1354 Florida St | Room By Room Maintenance Inc | response to complaint 2021-82136: install (n) kitchen cabinets, countertop, and appliances "in-kind" (n) paint (n) flooring. no construction. renovate three (e) bathroom w/ (n) cabinets, fixtures and finishes no(n) construction.Details
response to complaint 2021-82136: install (n) kitchen cabinets, countertop, and appliances "in-kind" (n) paint (n) flooring. no construction. renovate three (e) bathroom w/ (n) cabinets, fixtures and finishes no(n) construction. | $22,450 |
| Oct 16, 2020 | Completed final sign-off Apr 2021 | 32 Cunningham Pl | Room By Room Maintenance Inc | remodel two (e) bathrooms, install (n) finishes, (n) fixtures (sink & tub), (n) faucets, (n) faucets, (n) cabinet. no reconstruction reqd.Details
remodel two (e) bathrooms, install (n) finishes, (n) fixtures (sink & tub), (n) faucets, (n) faucets, (n) cabinet. no reconstruction reqd. | $17,790 |
| Oct 16, 2020 | Completed final sign-off Apr 2021 | 30 Cunningham Pl | Room By Room Maintenance Inc | remodel two (e) bathrooms. install (n) flooring, (n) fixtures (sink & tub) (n) faucets, (n) cabinet. no construction reqdDetails
remodel two (e) bathrooms. install (n) flooring, (n) fixtures (sink & tub) (n) faucets, (n) cabinet. no construction reqd | $17,850 |
| Oct 16, 2019 | Completed final sign-off Jun 2020 | 679 14th Av | Room By Room Maintenance Inc | to add 2 bedrooms and one full bath, remodel one full bath and convert extg half bath to laundry room at 3rd floor unit.Details
to add 2 bedrooms and one full bath, remodel one full bath and convert extg half bath to laundry room at 3rd floor unit. | $30,000 |
| Aug 30, 2019 | Completed final sign-off Jun 2020 | 51 Allston Wy | Room By Room Maintenance Inc | add 2 new bedrooms, 2 full baths, family room, 1 laundry rm at e gr fl. (less than 50% of walls being removed). 2nd fl add 1 full bath, remodel e bath and kitchen, relocate and renew furnace and water heaterDetails
add 2 new bedrooms, 2 full baths, family room, 1 laundry rm at e gr fl. (less than 50% of walls being removed). 2nd fl add 1 full bath, remodel e bath and kitchen, relocate and renew furnace and water heater | $70,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2019 | 123 Clement St | Room By Room Maintenance Inc | 2nd flr unit - add 2 (n) full bathrooms, remodel (e) kitchen and full bath and add stackable washer & dryer. 3rd flr unit - add 2 (n) full bathrooms, remodel (e) kitchen and full bath and add stackable washer & dryerDetails
2nd flr unit - add 2 (n) full bathrooms, remodel (e) kitchen and full bath and add stackable washer & dryer. 3rd flr unit - add 2 (n) full bathrooms, remodel (e) kitchen and full bath and add stackable washer & dryer | $80,000 |
| Oct 9, 2018 | Completed final sign-off Aug 2019 | 920 Cayuga Av | Room By Room Maintenance Inc | to repair extg foundation at the garage about 23 feet.Details
to repair extg foundation at the garage about 23 feet. | $5,000 |
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 920 Cayuga Av | Room By Room Maintenance Inc | to add a full bath on 2nd floor, change door opening for the bedroom and full bath. to add a half bath on the ground floor.Details
to add a full bath on 2nd floor, change door opening for the bedroom and full bath. to add a half bath on the ground floor. | $20,000 |
| Jul 16, 2018 | Completed final sign-off Apr 2019 | 249 Allison St | Room By Room Maintenance Inc | reframe 3 (e) bathroom walls in-kind out to dryrot. replace 450sf of subfloor due to dry rott. drywall repairs for mep. replace 30% of rear deck & stairs, in-kind due to dry rot.Details
reframe 3 (e) bathroom walls in-kind out to dryrot. replace 450sf of subfloor due to dry rott. drywall repairs for mep. replace 30% of rear deck & stairs, in-kind due to dry rot. | $10,000 |
| Oct 3, 2017 | Completed final sign-off Apr 2019 | 249 Allison St | Room By Room Maintenance Inc | remodel (1) ktichen and two bathrooms in kindDetails
remodel (1) ktichen and two bathrooms in kind | $30,000 |
| Jul 11, 2017 | Never finaled issued Jul 2017, no final | 2940 25th Av | Room By Room Maintenance Inc | 1st floor: add 1 family room, recreation room, 2 bedrooms & 2 baths. 2nd floor: remodle kitchen & 2 baths.Details
1st floor: add 1 family room, recreation room, 2 bedrooms & 2 baths. 2nd floor: remodle kitchen & 2 baths. | $80,000 |
| Jul 22, 2016 | Never finaled issued Jul 2016, no final | 2940 25th Av | Room By Room Maintenance Inc | in-kind remodel of (e) kitchen & 3 bathrooms.Details
in-kind remodel of (e) kitchen & 3 bathrooms. | $60,000 |
| Mar 17, 2016 | Never finaled issued Apr 2016, no final | 356 Urbano Dr | Room By Room Maintenance Inc | revision to ref pa 2015 0805 3460: new framing for stair headroom at 1st floorDetails
revision to ref pa 2015 0805 3460: new framing for stair headroom at 1st floor | $4,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1351 Harrison St | Room By Room Maintenance Inc | revision to ref pa 2015 1124 3473: add framing at ground flr under egress stair. n/a for maherDetails
revision to ref pa 2015 1124 3473: add framing at ground flr under egress stair. n/a for maher | $8,000 |
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 1351 Harrison St | Room By Room Maintenance Inc | repair fire damage as per n.o.v. dated 9-25-15includes roof, deck & stair in-kind @ rear of bldg. n/a maher ordinanceDetails
repair fire damage as per n.o.v. dated 9-25-15includes roof, deck & stair in-kind @ rear of bldg. n/a maher ordinance | $20,000 |
| Aug 5, 2015 | Completed final sign-off Jul 2016 | 356 Urbano Dr | Room By Room Maintenance Inc | 3rd floor: add one full bath and remodel (e) bath. 2nd floor: relocate bathroom and add one bedroom behind kitchen and remodel (e) kitchen. 1st floor: add two full bathrooms, 2 bedrooms and family room, new foundation and slab.Details
3rd floor: add one full bath and remodel (e) bath. 2nd floor: relocate bathroom and add one bedroom behind kitchen and remodel (e) kitchen. 1st floor: add two full bathrooms, 2 bedrooms and family room, new foundation and slab. | $100,000 |
| Jul 18, 2014 | Completed final sign-off May 2017 | 723 14th Av | Room By Room Maintenance Inc | renovation on all floors, structural work on ground floor only, no exterior work; maher n/a nfpa on separate permit. r-3 to r-2 conversion, legalization of existing unit.Details
renovation on all floors, structural work on ground floor only, no exterior work; maher n/a nfpa on separate permit. r-3 to r-2 conversion, legalization of existing unit. | $145,000 |
| Feb 5, 2014 | Completed final sign-off Aug 2014 | 778 26th Av | Yellow Zone Construction, Room By Room Maintenance Inc | add 3 bedroom & 2 bath @ ground floor, rearrange floor layout, add 2 bedroom & one bath @ 2/f. replace dry-rotted wall & broken foundation @ rear of bldg. remove existing deck & stair @ rear of bldg.Details
add 3 bedroom & 2 bath @ ground floor, rearrange floor layout, add 2 bedroom & one bath @ 2/f. replace dry-rotted wall & broken foundation @ rear of bldg. remove existing deck & stair @ rear of bldg. | $98,000 |
| Nov 5, 2013 | Completed final sign-off Aug 2014 | 507 Lyon St | Room By Room Maintenance Inc | interior remodeling of 3 units-replacement of windows & doors. adding 1 new kitchen & 3 new bathrooms. 1 new window & 1 exterior doorDetails
interior remodeling of 3 units-replacement of windows & doors. adding 1 new kitchen & 3 new bathrooms. 1 new window & 1 exterior door | $200,000 |
| Oct 25, 2013 | Completed final sign-off Aug 2014 | 507 Lyon St | Room By Room Maintenance Inc | remodel (2) kitchens (507 & 509) and (2) bathrooms (507 & 509) in kind.Details
remodel (2) kitchens (507 & 509) and (2) bathrooms (507 & 509) in kind. | $30,000 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 128 Coleridge St | Room By Room Maintenance Inc | adding a shower and sink to unit 128 coleridge (2nd floor).Details
adding a shower and sink to unit 128 coleridge (2nd floor). | $2,000 |
| Jul 25, 2013 | Expired or cancelled withdrawn Sep 2014 | 1150 South Van Ness Av | Room By Room Maintenance Inc | change of use from r-3 to r2. install new dwelling unit in empty ground fl storage parking area. remove existing garage door and replace w/ new entry door & window. add windows at g/f along side & rear walls. no horizontal or vertical addition to building. one kitchen + 3 full baths.Details
change of use from r-3 to r2. install new dwelling unit in empty ground fl storage parking area. remove existing garage door and replace w/ new entry door & window. add windows at g/f along side & rear walls. no horizontal or vertical addition to building. one kitchen + 3 full baths. | $42,500 |
| Jun 10, 2013 | Never finaled issued Jun 2013, no final | 234 Lake Merced Hill No Bl | Room By Room Maintenance Inc | revision to pa 201305288004; replace bathtub and shower wall tiles in kind in 2nd bath under the 1st permit.Details
revision to pa 201305288004; replace bathtub and shower wall tiles in kind in 2nd bath under the 1st permit. | $3,000 |
| May 31, 2013 | Completed final sign-off Nov 2013 | 380 Monterey Bl | Room By Room Maintenance Inc | remodel kitchen and bath in kind. lighting must comply w/cec 150 kDetails
remodel kitchen and bath in kind. lighting must comply w/cec 150 k | $22,000 |
| May 31, 2013 | Never finaled issued May 2013, no final | 1150 South Van Ness Av | Room By Room Maintenance Inc | 1150: remodel kitchen and bath in kind. 1152: remodel kitchen and bath in kind.Details
1150: remodel kitchen and bath in kind. 1152: remodel kitchen and bath in kind. | $44,000 |
| May 28, 2013 | Completed final sign-off Aug 2013 | 234 Lake Merced Hill No Bl | Room By Room Maintenance Inc | remodel master bathroom in kind, repl cabinets, sinks and faucets in 2 bathrooms, replace 8 interior doors in kindDetails
remodel master bathroom in kind, repl cabinets, sinks and faucets in 2 bathrooms, replace 8 interior doors in kind | $10,000 |
| Mar 22, 2013 | Completed final sign-off Feb 2015 | 126 Coleridge St | Room By Room Maintenance Inc | remove and replace extg retaining wall and fence at rear.Details
remove and replace extg retaining wall and fence at rear. | $15,000 |
| Dec 14, 2012 | Completed final sign-off Feb 2015 | 126 Coleridge St | Room By Room Maintenance Inc | renovate 2 units. work includes updated kitchens, baths, bedrooms. replace e windows and doors throughout. 2 new sliding doors at gr level rear. 2 new windows, 1 at rear, 1 on south side of 2nd level. 2 new bedrooms, baths, family room at gr levelDetails
renovate 2 units. work includes updated kitchens, baths, bedrooms. replace e windows and doors throughout. 2 new sliding doors at gr level rear. 2 new windows, 1 at rear, 1 on south side of 2nd level. 2 new bedrooms, baths, family room at gr level | $190,000 |