Frederick Schneider
- Listed as
- engineer
- On San Francisco permits
- Jul 2021 to Jul 2021
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2021 | Completed final sign-off Mar 2022 | 4125 26th St | Soil Technologies | to comply w/nov 201971041 located in rear rear of the backyard. excavate (2) 9-10' deep piers. install reinforced steel & concrete in piers. install 8" wide by 3-4' tall by 16-18' long concrete retaining wall structurally connected to piers. install 12" wide by 2.5' deep drain field behind wall &Details
to comply w/nov 201971041 located in rear rear of the backyard. excavate (2) 9-10' deep piers. install reinforced steel & concrete in piers. install 8" wide by 3-4' tall by 16-18' long concrete retaining wall structurally connected to piers. install 12" wide by 2.5' deep drain field behind wall & | $30,850 |