Franz Mutis
- Listed as
- architect, engineer
- Firm
- Design Everest Consulting Eng
- Based in
- Moutain View
- On San Francisco permits
- Mar 2019 to Jun 2025
10 permits since 2000 (engineer on 9 permits, architect on 1 permit): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2025 | Completed final sign-off Nov 2025 | 822 Pacheco St | revision to pa #2021-0826-7155 lowered the top wall height, adding 3 stairs at the top and removing stairs from the bottom wall to the property lineDetails
revision to pa #2021-0826-7155 lowered the top wall height, adding 3 stairs at the top and removing stairs from the bottom wall to the property line | ||
| Feb 3, 2025 | Completed final sign-off Nov 2025 | 822 Pacheco St | revision to permit 202108267155. changed the wall design from blocks to poured in place, added stairs and railing details. remove str strengtheningDetails
revision to permit 202108267155. changed the wall design from blocks to poured in place, added stairs and railing details. remove str strengthening | $25,000 | |
| Jan 29, 2024 | Completed final sign-off Jul 2025 | 538 22nd Av | revision to 202205063720, pgs a0.0,a2.2, a2.3, a2.6, s2, 2nd fl roof slope, updated roof over bedroom to plan, updated door/window schedule, structural changes according to arch plans, added missing detailsDetails
revision to 202205063720, pgs a0.0,a2.2, a2.3, a2.6, s2, 2nd fl roof slope, updated roof over bedroom to plan, updated door/window schedule, structural changes according to arch plans, added missing details | ||
| May 6, 2022 | Completed final sign-off Aug 2025 | 538 22nd Av | (n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding.Details
(n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding. | $415,000 | |
| Nov 9, 2021 | Completed final sign-off Apr 2023 | 2242 48th Av | Mountain Top Construction Llc | 2 bathroom remodel, kitchen remodel @ 2nd flDetails
2 bathroom remodel, kitchen remodel @ 2nd fl | $170,000 |
| Aug 26, 2021 | Completed final sign-off Nov 2025 | 822 Pacheco St | voluntary foundation repair, structural strengthening and adding new backyard retaining walls.Details
voluntary foundation repair, structural strengthening and adding new backyard retaining walls. | $10,000 | |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 635 Baker St | J O Roofing Co. | reroofingDetails
reroofing | $25,000 |
| Mar 24, 2021 | Expired or cancelled withdrawn Jul 2022 | 1650 Quesada Av | Skylight Tools Inc | kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same locationDetails
kitchen and 2 bath remodel. main floor bathroom & kitchen reconfiguration with structural wall modifications. relocating bathroom to expand kitchen foot print. upstairs bath remodel with replacements in kind & same location | $75,000 |
| Mar 18, 2021 | Completed final sign-off Nov 2021 | 8332 Geary Bl | Skylight Tools Inc | revision to pa# 202011239555. upon further inspection, no structural work was needed for basement plan.Details
revision to pa# 202011239555. upon further inspection, no structural work was needed for basement plan. | $60,000 |
| Mar 15, 2019 | Never finaled filed Mar 2019, never issued | 836 Lyon St | G B U Construction Development | struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.Details
struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system. | $45,000 |