Francisco M Duarte
- Listed as
- engineer
- Firm
- Sung Engineering
- Based in
- Union City
- On San Francisco permits
- Sep 2012 to Apr 2025
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2025 | Completed final sign-off Dec 2025 | 237 Pierce St | Viking Wood, Ivan Alberto Rivera Rivas | dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing.Details
dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing. | $15,000 |
| Dec 29, 2022 | Completed final sign-off Jun 2026 | 318 Detroit St | Tong Construction Inc | 2/f: remove/reconfigure (e) kitchen and dining and living room. remodel 2 (e) full baths. add a new half bath. remodel 2 (e) bedrooms and provide laundry closet. remove (e) ext. stair access to (e) deck, infill opening to match deck.Details
2/f: remove/reconfigure (e) kitchen and dining and living room. remodel 2 (e) full baths. add a new half bath. remodel 2 (e) bedrooms and provide laundry closet. remove (e) ext. stair access to (e) deck, infill opening to match deck. | $80,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2483 41st Av | Eco Pro Construction Inc | remove section of load bearing wall between of floor bedroom and rear garage space; instlal a new bathroom install a tankless water heater, new furnace, new door, window, utility sink, floor, sheet rock and straighten foundation.Details
remove section of load bearing wall between of floor bedroom and rear garage space; instlal a new bathroom install a tankless water heater, new furnace, new door, window, utility sink, floor, sheet rock and straighten foundation. | $50,000 |
| Sep 4, 2012 | Completed final sign-off Jun 2013 | 2 Mendosa Av | replace existing cement block retaining walls with reinforced concrete retaining walls & corten steel planters. replace wood guardrails w/corten steel guardrails.Details
replace existing cement block retaining walls with reinforced concrete retaining walls & corten steel planters. replace wood guardrails w/corten steel guardrails. | $9,000 |