Francisco M Duarte
- License
- C69094
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C69094 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sung Engineering
- Based in
- Union City
- On San Francisco permits
- Sep 2012 to Apr 2025
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Eco Pro Construction Inc, Ivan Alberto Rivera Rivas, Tong Construction Inc, Viking Wood
- Architects
- Jared Kuykendall
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2025 | Completed final sign-off Dec 2025 | 237 Pierce St | Viking Wood, Ivan Alberto Rivera Rivas | dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing.Details
dry rotted siding replacement. replacement of (5) windows and (2) door in kind. replacement of (3) dry rotted beams. all work is in the rear facade, no work is street facing. | $15,000 |
| Dec 29, 2022 | Completed final sign-off Jun 2026 | 318 Detroit St | Tong Construction Inc | 2/f: remove/reconfigure (e) kitchen and dining and living room. remodel 2 (e) full baths. add a new half bath. remodel 2 (e) bedrooms and provide laundry closet. remove (e) ext. stair access to (e) deck, infill opening to match deck.Details
2/f: remove/reconfigure (e) kitchen and dining and living room. remodel 2 (e) full baths. add a new half bath. remodel 2 (e) bedrooms and provide laundry closet. remove (e) ext. stair access to (e) deck, infill opening to match deck. | $80,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2483 41st Av | Eco Pro Construction Inc | remove section of load bearing wall between of floor bedroom and rear garage space; instlal a new bathroom install a tankless water heater, new furnace, new door, window, utility sink, floor, sheet rock and straighten foundation.Details
remove section of load bearing wall between of floor bedroom and rear garage space; instlal a new bathroom install a tankless water heater, new furnace, new door, window, utility sink, floor, sheet rock and straighten foundation. | $50,000 |
| Sep 4, 2012 | Completed final sign-off Jun 2013 | 2 Mendosa Av | replace existing cement block retaining walls with reinforced concrete retaining walls & corten steel planters. replace wood guardrails w/corten steel guardrails.Details
replace existing cement block retaining walls with reinforced concrete retaining walls & corten steel planters. replace wood guardrails w/corten steel guardrails. | $9,000 |