Francis Iwekaogwu
- License
- C53339
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C53339 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Aug 2017 to Feb 2018
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Penhall Company (3)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 14, 2018 | Completed final sign-off Jun 2018 | 1661 Bush St | Penhall Company | revision to 201708033760 work to include anchorage of (e) walls (shear walls) to (e) foundation. as reqd (voluntary structural stregthening) field revisions. to comply with nov#201715431Details
revision to 201708033760 work to include anchorage of (e) walls (shear walls) to (e) foundation. as reqd (voluntary structural stregthening) field revisions. to comply with nov#201715431 | $1,000 |
| Jan 4, 2018 | Completed final sign-off Aug 2018 | 2620 Laguna St | Penhall Company | garage door widening. 7'-0" to 8'-0". maher naDetails
garage door widening. 7'-0" to 8'-0". maher na | $20,000 |
| Aug 3, 2017 | Completed final sign-off Jun 2018 | 1661 Bush St | Penhall Company | . mandatory soft story upgrade per sfebc chapter 4d. work to include anchorage of (e) walls to (e) foundation as required in basement.Details
. mandatory soft story upgrade per sfebc chapter 4d. work to include anchorage of (e) walls to (e) foundation as required in basement. | $6,500 |
| Aug 3, 2017 | Completed final sign-off Aug 2019 | 283 20th Av | strengthening of e wood shear walls in compliance w mandatory seismic retrofit per city of sf 66-13 per 2016 iebc appendix a-4.Details
strengthening of e wood shear walls in compliance w mandatory seismic retrofit per city of sf 66-13 per 2016 iebc appendix a-4. | $25,000 |