Fei Fei Feng
- Listed as
- architect
- Firm
- Moment X
- Based in
- Sf
- On San Francisco permits
- Mar 2022 to Nov 2024
6 permits since 2000 (architect on 6 permits): 4 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2024 | Completed final sign-off Mar 2026 | 350 11th St | tenant improvement (ti) of an (e) four story building for the upper three stories the work includes adding one kitchenette one copy area two offices and one meeting room on each fl. (1,121aqft) the total ti area is 3,363 sqft. no change to building foot print. mechanical deferred.Details
tenant improvement (ti) of an (e) four story building for the upper three stories the work includes adding one kitchenette one copy area two offices and one meeting room on each fl. (1,121aqft) the total ti area is 3,363 sqft. no change to building foot print. mechanical deferred. | $30,000 | |
| Jul 18, 2024 | Completed final sign-off Jul 2024 | 355 01st St | revision to pa# 202206136172: change the name of the new room in living space from bedroom to den on the plans and in the description.Details
revision to pa# 202206136172: change the name of the new room in living space from bedroom to den on the plans and in the description. | ||
| Jun 13, 2024 | In progress issued Jun 2024 | 743 Carolina St | Sean Michael Mchugh Construction | revision to 202203099600: relocate closet & bathroom walls (non-structural) to right around 20"Details
revision to 202203099600: relocate closet & bathroom walls (non-structural) to right around 20" | |
| Jun 29, 2022 | Completed final sign-off Mar 2023 | 2460 Mission St | Yama Construction | tenant improvement of e 1 story massage business. proposed use will still be a massage business. scope includes modifying interior walls, add interior partitons. no change in building footprint and facade.Details
tenant improvement of e 1 story massage business. proposed use will still be a massage business. scope includes modifying interior walls, add interior partitons. no change in building footprint and facade. | $15,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2024 | 355 01st St | Kelun Construction, Barcci Builders Inc | interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers.Details
interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers. | $90,000 |
| Mar 9, 2022 | Never finaled issued Mar 2023, no final | 743 Carolina St | Sean Michael Mchugh Construction | revision to pa 202104269305: interior layout change; ground floor and basement popout in the rear yard, 2nd floor addition to the average depth of neighboring buildingDetails
revision to pa 202104269305: interior layout change; ground floor and basement popout in the rear yard, 2nd floor addition to the average depth of neighboring building | $70,000 |