Permit GraphShortlistSan Francisco building permits since 2000

Farzin Eshtehar

License
2935
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
Firm
Ideal Design & Engineering
On San Francisco permits
Jun 2014 to Dec 2016

5 permits since 2000 (engineer on 5 permits): 5 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Throne Builders Inc (2), Atm Construction, Britannia Construction, Inc.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 27, 2016Completed
final sign-off Apr 2017
917 Broderick Streplace bearing wall with a beam for a large kitchen area. new cabinets and new skylight
Details
Permit
201612275899
Permit issued
Dec 29, 2016
Final sign-off
Apr 25, 2017

replace bearing wall with a beam for a large kitchen area. new cabinets and new skylight

Open the permit page

$9,000
Oct 14, 2016Completed
final sign-off Jun 2021
1576 Great HyAtm Constructionsoft story per sfbc chapter 34b, iebc 2012 appendix a-4
Details
Permit
201610140316
Permit issued
Nov 2, 2016
Final sign-off
Jun 1, 2021

soft story per sfbc chapter 34b, iebc 2012 appendix a-4

Open the permit page

$22,000
Jul 5, 2016Completed
final sign-off Nov 2016
2663 18th AvThrone Builders Incnew bedroom, new full bathroom, new media room on level 1 ( first floor).
Details
Permit
201607051603
Permit issued
Jul 22, 2016
Final sign-off
Nov 9, 2016

new bedroom, new full bathroom, new media room on level 1 ( first floor).

Open the permit page

$20,000
Apr 11, 2016Completed
final sign-off Aug 2016
739 48th AvThrone Builders Increvision to pa#201601257929. work to include structural beam and post replacement at existing wall. reconfigure ground floor masterbedroom and bathroom.
Details
Permit
201604114430
Permit issued
Apr 18, 2016
Final sign-off
Aug 24, 2016

revision to pa#201601257929. work to include structural beam and post replacement at existing wall. reconfigure ground floor masterbedroom and bathroom.

Open the permit page

$60,000
Jun 6, 2014Completed
final sign-off Feb 2016
2501 Cabrillo StBritannia Construction, Inc.to comply w/ 201473781 -vehicle damage repair to side wall foundation, framing, stucco repair in kind. "work in common area"
Details
Permit
201406067671
Permit issued
Jun 16, 2014
Final sign-off
Feb 26, 2016

to comply w/ 201473781 -vehicle damage repair to side wall foundation, framing, stucco repair in kind. "work in common area"

Open the permit page

$10,000