Fannie Camille She
- Listed as
- architect, authorized agent-others, designer
- Firm
- Fannie Camille She, Archit
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Sep 2026
26 permits since 2000 (architect on 24 permits, designer on 2 permits, authorized agent-others on 1 permit): 21 completed, 1 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1124 Treat Av | convert rear portion of garage to state adu; excavate for 8'-0" ceiling height.voluntary foundation replacement; nfpa 13r sprinklers under separate permit.replace existing rear yard decks & property line wall & remove existing deck enclosure.remodel 3rd floor kitchen. adu subject to ab112.Details
convert rear portion of garage to state adu; excavate for 8'-0" ceiling height.voluntary foundation replacement; nfpa 13r sprinklers under separate permit.replace existing rear yard decks & property line wall & remove existing deck enclosure.remodel 3rd floor kitchen. adu subject to ab112. | $337,028 | |
| May 22, 2025 | Completed final sign-off Dec 2025 | 732 33rd Av | Opus Pacific Development | 2nd fl/ remodel kitchen and enlarge opening between kitchen and dining roomDetails
2nd fl/ remodel kitchen and enlarge opening between kitchen and dining room | $51,594 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 4545 Lincoln Wy | J S B Construction | 1st fl: convert portion of garage ot (n) entry/laundry. 2nd fl: remove wall btwn kitchen & dining rooml new cabinets btwn kitchen & dining (main kitchen to remain unchanged; widen opg. btwn living & dining room.Details
1st fl: convert portion of garage ot (n) entry/laundry. 2nd fl: remove wall btwn kitchen & dining rooml new cabinets btwn kitchen & dining (main kitchen to remain unchanged; widen opg. btwn living & dining room. | $28,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 678 11th Av | Blue Stone Construction | rev to pa# 201709117557; the (e) gas meter will remain in place as allowed by information sheet eg-05Details
rev to pa# 201709117557; the (e) gas meter will remain in place as allowed by information sheet eg-05 | |
| Sep 11, 2017 | Completed final sign-off Nov 2019 | 678 11th Av | Blue Stone Construction | per unit legalization ordinance 43-14, legalize unit at 1st floor, habitable space under pa 9515386. fire sprinkler under separate permit.Details
per unit legalization ordinance 43-14, legalize unit at 1st floor, habitable space under pa 9515386. fire sprinkler under separate permit. | $21,603 |
| Jul 17, 2017 | Completed final sign-off May 2018 | 3 Elizabeth St | Allsite Building Supply Inc | revision to permit #201607182557s1, remove (e) post in bedroom # 3, change location layout of 1st floor bathrm.Details
revision to permit #201607182557s1, remove (e) post in bedroom # 3, change location layout of 1st floor bathrm. | $5,000 |
| Jul 13, 2017 | Completed final sign-off Nov 2018 | 1610 40th Av | Essa's Remodeling | convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat)Details
convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat) | $43,000 |
| May 15, 2017 | Completed final sign-off Feb 2018 | 231 Duncan St | Raymond Peng Construction | remove non-structural wall between kitchen & dining room, remodel kitchen; widen structural opening between dining & living room, remodel bathroom.Details
remove non-structural wall between kitchen & dining room, remodel kitchen; widen structural opening between dining & living room, remodel bathroom. | $27,000 |
| Jul 18, 2016 | Completed final sign-off May 2018 | 3 Elizabeth St | Yiu Cheong Construction Co Inc, Allsite Building Supply Inc | story horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam).Details
story horiz. addition in the space of the (e) old rear addition enclosed stair @ side yard;legalize and reconfigure area @ 1st floor; (2/f: add half bath;remodel(e) full bath on 2/f); interior kitchen remodel (remove (e) structural beam). | $162,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 1974 44th Av | Mccormack Construction | 1st flr: divide (e) family room into media room & office, convert portion of garage to bathroom, 2nd flr no work. no expansion ,no frame workDetails
1st flr: divide (e) family room into media room & office, convert portion of garage to bathroom, 2nd flr no work. no expansion ,no frame work | $46,875 |
| Mar 3, 2016 | Completed final sign-off Jun 2016 | 508 Oak St | Mccormack Construction | add full bath in the space of the (e) closet and hallway nook (28.6 sf)Details
add full bath in the space of the (e) closet and hallway nook (28.6 sf) | $14,665 |
| Oct 14, 2015 | Completed final sign-off Jan 2016 | 6 Pinehurst Wy | Wesco Construction | 1/f- convert portion of garage to office & bathroom.Details
1/f- convert portion of garage to office & bathroom. | $28,414 |
| Jun 4, 2015 | Completed final sign-off Sep 2015 | 2855 Jackson St | Raymond Peng Construction | add shower to extg half bath within space of extg bathroom.Details
add shower to extg half bath within space of extg bathroom. | $10,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 2748 Steiner St | Ng's Landmark Bldg & Engineering, Gustavo Mendonca Gen Cont | remodel bathroom within the space of the extg bathroom, remove non-structural wall between toilet compartment and shower area.Details
remodel bathroom within the space of the extg bathroom, remove non-structural wall between toilet compartment and shower area. | $16,500 |
| Sep 18, 2014 | Completed final sign-off Apr 2015 | 259 Crescent Av | Di Vine Construction | remodel kitchen within space of (e) kitchen.Details
remodel kitchen within space of (e) kitchen. | $21,500 |
| Apr 24, 2014 | Completed final sign-off Dec 2014 | 1334 26th Av | Raymond Peng Construction | kitchen remodel entirely within footprint of existing kitchen.Details
kitchen remodel entirely within footprint of existing kitchen. | $22,950 |
| Feb 22, 2013 | Never finaled issued Feb 2013, no final | 231 Duncan St | Raymond Peng Construction | 1st floor: remodel e family room and bath, add 15 sf of conditioned space to enlarge bathroom, new sliding door in e window opening at rear facade.replace (e) post footing (330 sf and bath) 2nd fl: convert e closet to laundryDetails
1st floor: remodel e family room and bath, add 15 sf of conditioned space to enlarge bathroom, new sliding door in e window opening at rear facade.replace (e) post footing (330 sf and bath) 2nd fl: convert e closet to laundry | $64,130 |
| Mar 20, 2012 | Never finaled issued Apr 2012, no final | 735 Webster St | Raymond Peng Construction | converting (e) office to master bathroom. no work at garage, not adding habitable spaceDetails
converting (e) office to master bathroom. no work at garage, not adding habitable space | $13,000 |
| Sep 7, 2011 | Completed final sign-off Dec 2011 | 3230 Irving St | Raymond Peng Construction | remove non bearing wall between (e) kitchen and (e) dining room. remodel (e) kitchen, general layout of (e) kitchen to remain the same. add solar tube above entry stairsDetails
remove non bearing wall between (e) kitchen and (e) dining room. remodel (e) kitchen, general layout of (e) kitchen to remain the same. add solar tube above entry stairs | $18,000 |
| Aug 28, 2009 | Completed final sign-off Jan 2010 | 5224 California St | Alex Painting & Construction | 1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet.Details
1st floor -replace (e) water heaters & furnaces. 2nd & 3rd floor - remodel (e) kitchen & (e) bathroom ( combine (e) 1/2 bath & (e) bath), add new bathroom adj to master bedroom. remove non-structural walls between kitchen/office/m. bedroom closet. | $65,256 |
| Oct 31, 2008 | Completed final sign-off Feb 2009 | 1104 Treat Av | Jimenez Construction Sf Inc | garage level: 2 new posts, 2nd floor, remove wall & kitchen remodel, 3rd floor, re-frame stairs, expand bathroom.Details
garage level: 2 new posts, 2nd floor, remove wall & kitchen remodel, 3rd floor, re-frame stairs, expand bathroom. | $40,602 |
| Apr 22, 2008 | Completed final sign-off Dec 2008 | 171 20th Av | Raymond Peng Construction | bathrm remodel with extension into adjacent closet through a non-structural wallDetails
bathrm remodel with extension into adjacent closet through a non-structural wall | $26,308 |
| Jan 2, 2008 | Completed final sign-off Apr 2008 | 1530 Mcallister St | Alex Painting & Construction | work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work.Details
work on unit #2 - remodel bathroom in-kind (new toilet, sink, finishes) and remodel kitchen in-kind (new finishes & fixtures). high efficiency fixtures in bathroom (or else motion sensor switch); 50% wattage high efficiency fixtures in kitchen. no nex exhaust duct work. | $35,000 |
| Aug 15, 2007 | Completed final sign-off Jan 2008 | 1601 Eucalyptus Dr | construct new family room and full bathroom in existing garage. new window & doors in new rooms only at rear facade. replace furnace in kind same locationDetails
construct new family room and full bathroom in existing garage. new window & doors in new rooms only at rear facade. replace furnace in kind same location | $30,000 | |
| Sep 23, 2005 | Completed final sign-off Dec 2005 | 6020 California St | Alex Painting & Construction | roof deck constructed w/o permit-tocomply w/n.o.v rec'dDetails
roof deck constructed w/o permit-tocomply w/n.o.v rec'd | $1,500 |
| Jun 28, 2005 | Completed final sign-off Dec 2005 | 374 27th Av | new hydronic radiant heat,kitchen remodel,bathroom remodel,m.bath remodel.2 new 7' & 8'cased opgs inDetails
new hydronic radiant heat,kitchen remodel,bathroom remodel,m.bath remodel.2 new 7' & 8'cased opgs in | $70,000 |