Nick Noyes
- License
- C24278
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Everett Nisson Arch
- Based in
- Sf
- On San Francisco permits
- May 2005 to Sep 2025
3 permits since 2000 (architect on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2025 | In progress issued Sep 2025 | 44 Commonwealth Av | remodel 2 bathroom on 2nd floor front and middle in kind replacement. remodel closet master bedroom, 2nd floor front built in shelving remodel closet bedroom rear in kind replacement. update electrical replace knob and tube, widen garage by 2ft horizontalDetails
remodel 2 bathroom on 2nd floor front and middle in kind replacement. remodel closet master bedroom, 2nd floor front built in shelving remodel closet bedroom rear in kind replacement. update electrical replace knob and tube, widen garage by 2ft horizontal | $250,000 | |
| Jun 27, 2005 | Completed final sign-off Aug 2006 | 743 19th Av | kitchen & powder room remodel. 2 upstair bathrooms remodel.Details
kitchen & powder room remodel. 2 upstair bathrooms remodel. | $75,000 | |
| May 16, 2005 | Completed final sign-off Nov 2005 | 3186 Clay St | remodel 2 bathrooms. enlarge kitchen access. move & replace door. retile terrace.Details
remodel 2 bathrooms. enlarge kitchen access. move & replace door. retile terrace. | $75,000 |