Eugene Yun
- Listed as
- architect
- Based in
- Berkeley
- On San Francisco permits
- Nov 2017 to Apr 2023
12 permits since 2000 (architect on 12 permits): 11 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2023 | Completed final sign-off Sep 2023 | 285 Winston Dr | W D S Construction Inc | minor t.i. on level1: work includes enclosing existing stairs & escalators, new partitions to create vestibules at existing stairs, new partitions at new fire -riser rm to be separated from leasble area, replacing existing doors w/double doors for increased exit capacity.Details
minor t.i. on level1: work includes enclosing existing stairs & escalators, new partitions to create vestibules at existing stairs, new partitions at new fire -riser rm to be separated from leasble area, replacing existing doors w/double doors for increased exit capacity. | $162,800 |
| Apr 15, 2021 | Completed final sign-off Oct 2021 | 400 Winston Dr | Vcc, Llc | to record final declaration of restrictions and grant of easements. for record keeping permit only.Details
to record final declaration of restrictions and grant of easements. for record keeping permit only. | |
| Oct 9, 2020 | Completed final sign-off Oct 2021 | 400 Winston Dr | Vcc, Llc | revision to pa 201711284984. removal and replacement of spray applied fire resistive material with intumescent fire resistive material on the underside of structural steel members located in exit stair 4 and exit stair 9.Details
revision to pa 201711284984. removal and replacement of spray applied fire resistive material with intumescent fire resistive material on the underside of structural steel members located in exit stair 4 and exit stair 9. | |
| Aug 19, 2019 | Completed final sign-off Sep 2021 | 3251 20th Av | Vcc, Llc | revision to app#201711224699. change interior layout of west entry by adding full height partition. revise canopy at entrance.Details
revision to app#201711224699. change interior layout of west entry by adding full height partition. revise canopy at entrance. | $20,000 |
| Aug 5, 2019 | Expired or cancelled cancelled Jan 2026 | 3251 20th Av | Vcc, Llc | revision to pa #201802201700. upgrade to approved smoke control report per italicized words.Details
revision to pa #201802201700. upgrade to approved smoke control report per italicized words. | |
| Jul 2, 2019 | Completed final sign-off Jul 2021 | 233 Winston Dr | W D S Construction Inc | market building j. three new openings between (e) anchor building and (e) market building j for a single tenant across the 2 anchor buildings over two floors. reconfigure ramps and stairs at loading dock. interior work. ref 2019-0701-4861 sprinkler/fire alarm under sep permit.Details
market building j. three new openings between (e) anchor building and (e) market building j for a single tenant across the 2 anchor buildings over two floors. reconfigure ramps and stairs at loading dock. interior work. ref 2019-0701-4861 sprinkler/fire alarm under sep permit. | $100,000 |
| Jul 2, 2019 | Completed final sign-off Jul 2021 | 3251 20th Av | W D S Construction Inc | reconfigure (e) mall opening and display at level 2. reconfigure exit passageway at level 2. interior work only.Details
reconfigure (e) mall opening and display at level 2. reconfigure exit passageway at level 2. interior work only. | $50,000 |
| Jul 1, 2019 | Completed final sign-off Aug 2021 | 285 Winston Dr | W D S Construction Inc | nordstrom anchor bldg. reconfigure (e)vacant 3-story anchor bldg to separate tenant spaces on each fl. occupancy use of retail, cafeterias, etc.shell core for all retail & restaurant. future retail/restaurant under separate permit. interior improvement common area & add circulation & new fl openingsDetails
nordstrom anchor bldg. reconfigure (e)vacant 3-story anchor bldg to separate tenant spaces on each fl. occupancy use of retail, cafeterias, etc.shell core for all retail & restaurant. future retail/restaurant under separate permit. interior improvement common area & add circulation & new fl openings | $15,000,000 |
| Feb 22, 2019 | Completed final sign-off Oct 2021 | 400 Winston Dr | Vcc, Llc | revision to pa 2017-1128-4984. eliminate new concrete wall opening and leave exising wall. update floor plans and details. revise parapit height detailing at gl4e between de and ee5 gridlines. update all arch & structural plans accordingly. added new parapet & roof deck.Details
revision to pa 2017-1128-4984. eliminate new concrete wall opening and leave exising wall. update floor plans and details. revise parapit height detailing at gl4e between de and ee5 gridlines. update all arch & structural plans accordingly. added new parapet & roof deck. | |
| Nov 8, 2018 | Completed final sign-off Oct 2021 | 3251 20th Av | Vcc, Llc | revision to pa# 2018/02/20/1700 value engineering of approved permit. demo of walls on level 1 & level 2 slab fol new floor opening. addition of vertical circulation @ north end of mall. new interior improvements.Details
revision to pa# 2018/02/20/1700 value engineering of approved permit. demo of walls on level 1 & level 2 slab fol new floor opening. addition of vertical circulation @ north end of mall. new interior improvements. | |
| Feb 20, 2018 | Completed final sign-off Sep 2021 | 3251 20th Av | Vcc, Llc | renovate mall interior -reconfigure common area adjacent to anchor building- stairs, ramps, new floor openingsDetails
renovate mall interior -reconfigure common area adjacent to anchor building- stairs, ramps, new floor openings | $6,697,016 |
| Nov 22, 2017 | Completed final sign-off Sep 2021 | 3251 20th Av | Vcc, Llc | mall exterior improvements reconfigure the site & western mall entries @ the north end of the mall. project scope is for demo & rebuilding of the level 2 west mall entry; addition of (1)(n) entry @ level 1; modifications to hardscaping, planting & parkingDetails
mall exterior improvements reconfigure the site & western mall entries @ the north end of the mall. project scope is for demo & rebuilding of the level 2 west mall entry; addition of (1)(n) entry @ level 1; modifications to hardscaping, planting & parking | $3,340,937 |