Ella Li
- License
- C99346
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C99346 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2026 to Nov 2026
4 permits since 2000 (engineer on 4 permits): 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Zhong Yuan Inc (2)
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2026 | In progress filed Nov 2026, not yet issued | 601 42nd Av | 2/f: remodel kitchen, bath, and add 1 full bath. changing layout. 3/f: remodel bath and add 1 full bath and laundry. changing layout.Details
2/f: remodel kitchen, bath, and add 1 full bath. changing layout. 3/f: remodel bath and add 1 full bath and laundry. changing layout. | $120,000 | |
| Oct 29, 2026 | In progress issued Oct 2026 | 842 Edinburgh St | Zhong Yuan Inc | revision to pa#202610028968: increase (e) 70amp electrical meter to 200amp. add electrical range to wet bar.Details
revision to pa#202610028968: increase (e) 70amp electrical meter to 200amp. add electrical range to wet bar. | |
| Oct 2, 2026 | In progress issued Oct 2026 | 842 Edinburgh St | Zhong Yuan Inc | interior remodel: convert part of existing 1st fl: 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet bar, remodel (e) bath.Details
interior remodel: convert part of existing 1st fl: 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet bar, remodel (e) bath. | $55,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 161 Miramar Av | remodel kitchen on level 1 to include upgrade to main panel 200amps.Details
remodel kitchen on level 1 to include upgrade to main panel 200amps. | $28,800 |