Ella Li
- Listed as
- engineer
- On San Francisco permits
- Sep 2026 to Oct 2026
2 permits since 2000 (engineer on 2 permits): 2 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 842 Edinburgh St | Zhong Yuan Inc | interior remodel: convert part of existing 1st fl" 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet barDetails
interior remodel: convert part of existing 1st fl" 1 bed, 1 bath to 2 bed, 1 1/2 bath and wet bar | $35,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 161 Miramar Av | remodel kitchen on level 1 to include upgrade to main panel 200amps and replace (e) water heater to tankless water heaterDetails
remodel kitchen on level 1 to include upgrade to main panel 200amps and replace (e) water heater to tankless water heater | $28,800 |