Edward Pais
- License
- C4935
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Macdonald Architects
- On San Francisco permits
- Apr 2005 to Mar 2006
3 permits since 2000 (architect on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Eicon Inc
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 30, 2006 | Completed final sign-off Nov 2008 | 1366 Stevenson St | to erect 1 dwelling unit with 4 story new residential & private parking building.Details
to erect 1 dwelling unit with 4 story new residential & private parking building. | $400,000 | |
| Mar 30, 2006 | Completed final sign-off Nov 2008 | 1356 Stevenson St | to erect 4 dwelling units with 4 stories new residential & private parking building.Details
to erect 4 dwelling units with 4 stories new residential & private parking building. | $1,000,000 | |
| Apr 20, 2005 | Expired or cancelled expired May 2007 | 3000 23rd St | Eicon Inc | rev. of 3 pages viz a.1,a3.1 & a3.2 change from 2 hr. to 1 hr.fire resistive construction for airDetails
rev. of 3 pages viz a.1,a3.1 & a3.2 change from 2 hr. to 1 hr.fire resistive construction for air |