Permit GraphShortlistSan Francisco building permits since 2000

Edmund Shum

License
C19441
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C19441 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Public Work
Based in
San Francisco
On San Francisco permits
Jun 2013 to Oct 2015

3 permits since 2000 (architect on 1 permit, authorized agent-others on 1 permit, engineer on 1 permit): 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Roebuck Construction

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 21, 2015Completed
final sign-off Dec 2015
70 Elk StRoebuck Constructionsoft demo of recently vacant public recreation ctr. the work involves the removal of all non structural elements of the bld which includes all mep, doors and windows and all finishes. bldg. is non sprinklereed and no fire alarm.
Details
Permit
201510210420
Permit issued
Oct 23, 2015
Final sign-off
Dec 2, 2015

soft demo of recently vacant public recreation ctr. the work involves the removal of all non structural elements of the bld which includes all mep, doors and windows and all finishes. bldg. is non sprinklereed and no fire alarm.

Open the permit page

Jun 24, 2014Completed
final sign-off Mar 2020
70 Elk Stsite plan for phace ii. renovation, seismic retrofit of (e) building. addition of a multi-purpose room & bleacher. new lobby- construction, mep, fire alarm and sprinklesr separate permits.
Details
Permit
201406249343
Permit issued
Aug 28, 2015
Final sign-off
Mar 30, 2020

site plan for phace ii. renovation, seismic retrofit of (e) building. addition of a multi-purpose room & bleacher. new lobby- construction, mep, fire alarm and sprinklesr separate permits.

Open the permit page

$8,200,000
Jun 28, 2013Completed
final sign-off Mar 2014
855 36th Avto renew app #9319845 to obtain final inspection for work approved under app #9319845 all work is complete
Details
Permit
201306280759
Permit issued
Jun 28, 2013
Final sign-off
Mar 4, 2014

to renew app #9319845 to obtain final inspection for work approved under app #9319845 all work is complete

Open the permit page