Douglas Karlsberg
- Listed as
- engineer
- Firm
- Burns &Mcdonnell Eng
- Based in
- Los Angeles
- On San Francisco permits
- Jul 2023 to Jul 2023
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2023 | In progress issued Dec 2025 | 2180 Harrison St | W. Bradley Electric | ***priority process*install electric vehicle infrastructure to support 89 charge ports for an existing service yard (no change of use). a total of (25) 19.2kw ac level 2 ports, (20) 22.5kw dc wallbox ports, (4) 92kw dcfc ports and associated electrical equipment will be installed. additionally,Details
***priority process*install electric vehicle infrastructure to support 89 charge ports for an existing service yard (no change of use). a total of (25) 19.2kw ac level 2 ports, (20) 22.5kw dc wallbox ports, (4) 92kw dcfc ports and associated electrical equipment will be installed. additionally, | $581,065 |