Eliram Eliran Susan Shai Drihem
- Listed as
- authorized agent-others, contractor
- Firm
- Bayside Builders Group Inc
- Based in
- Alameda
- On San Francisco permits
- Dec 2021 to Sep 2026
50 permits since 2000 (contractor on 50 permits, authorized agent-others on 2 permits): 40 completed, 5 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 597 Lincoln Wy | Bayside Builders Group Inc | reference to permit # bldg-26-1801 per inspectors request. framing members for dry rot deterioration across the exterior walls. total quantity of exterior wall studs requiring replacement approx. 10-15% of the overall exterior. in kind.Details
reference to permit # bldg-26-1801 per inspectors request. framing members for dry rot deterioration across the exterior walls. total quantity of exterior wall studs requiring replacement approx. 10-15% of the overall exterior. in kind. | $20,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 3468 16th St | Bayside Builders Group Inc | partial bathroom remodel in kind - convert tub to shower, no change to vanity or toilet, no layout change. no curbless shower. no chang to floor layout. no change to wall layout. no structural work.Details
partial bathroom remodel in kind - convert tub to shower, no change to vanity or toilet, no layout change. no curbless shower. no chang to floor layout. no change to wall layout. no structural work. | $10,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1 Topaz Wy | Bayside Builders Group Inc | replace only the bath tub in the guest bathroom (bathtub to bathtub), replace (e) fan upgrade m-e-p as needed to code.Details
replace only the bath tub in the guest bathroom (bathtub to bathtub), replace (e) fan upgrade m-e-p as needed to code. | $8,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 12 Mabrey Ct | Bayside Builders Group Inc | kitchen remodel like for like, no structural changes, replace cabinets, countertops, fixtures, appliances and upgrade mep to code as needed, replace stove, hood range fan/vent (120 sq ft)Details
kitchen remodel like for like, no structural changes, replace cabinets, countertops, fixtures, appliances and upgrade mep to code as needed, replace stove, hood range fan/vent (120 sq ft) | $26,000 |
| Jun 22, 2026 | Expired or cancelled cancelled Jul 2026 | 1 Topaz Wy | Bayside Builders Group Inc, Reliable Construction Inc | remodel bathroom, change out counter top. upgrade house electrical.Details
remodel bathroom, change out counter top. upgrade house electrical. | $41,000 |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 124 Panorama Dr | Bayside Builders Group Inc | replace existing tiles and waterproof front stairs, less than 50% repairs. street facing.Details
replace existing tiles and waterproof front stairs, less than 50% repairs. street facing. | $3,000 |
| May 28, 2026 | Completed final sign-off Jul 2026 | 124 Panorama Dr | Bayside Builders Group Inc | revision to bldg 26-252 per inspectors request. add new plywood & dry rot repair to scope.Details
revision to bldg 26-252 per inspectors request. add new plywood & dry rot repair to scope. | $8,000 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 2750 Market St | Bayside Builders Group Inc | apt 302: full bathroom remodel. convert tub to shower. replace toilet, sink, vanity, fan. upgrade mep to code. add washer and dryer behind shower wall in hallway closet.Details
apt 302: full bathroom remodel. convert tub to shower. replace toilet, sink, vanity, fan. upgrade mep to code. add washer and dryer behind shower wall in hallway closet. | $20,000 |
| Feb 23, 2026 | Completed final sign-off Apr 2026 | 5027 Diamond Heights Bl | Bayside Builders Group Inc | freestanding porch/patio deck- not attached to have below 2"4 height. less than 30" from walksing surface to grade at any point (sfbc 106a.2[7]). 152 sqft totalDetails
freestanding porch/patio deck- not attached to have below 2"4 height. less than 30" from walksing surface to grade at any point (sfbc 106a.2[7]). 152 sqft total | $8,000 |
| Jan 16, 2026 | Completed final sign-off Feb 2026 | 333 Holly Park Cr | Bayside Builders Group Inc | replace siding 1300 sqft from wood side to t-11 back side of the house and part of the front left of the house.Details
replace siding 1300 sqft from wood side to t-11 back side of the house and part of the front left of the house. | $25,000 |
| Oct 24, 2025 | Completed final sign-off Apr 2026 | 220 Lombard St | Bayside Builders Group Inc | unit #118: bathroom remodel like for like no structural. changes 52sqft. showerDetails
unit #118: bathroom remodel like for like no structural. changes 52sqft. shower | $13,000 |
| Aug 22, 2025 | Completed final sign-off Oct 2025 | 140 Vale Av | Bayside Builders Group Inc | 260 sq ft replace rotten wood siding like for like. back of the house not visible from streetDetails
260 sq ft replace rotten wood siding like for like. back of the house not visible from street | $5,000 |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 638 Edinburgh St | Bayside Builders Group Inc | kitchen remodel like for like no structual changes. 150 sq ft. 3 window being replaced. 1 window street facing. all vinyl windows. front window replaced with vinyl picture/fixed.Details
kitchen remodel like for like no structual changes. 150 sq ft. 3 window being replaced. 1 window street facing. all vinyl windows. front window replaced with vinyl picture/fixed. | $20,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2025 | 275 Ralston St | Bayside Builders Group Inc | 400 sq ft stucco replacement only front of the house. street visible. like for like.Details
400 sq ft stucco replacement only front of the house. street visible. like for like. | $10,000 |
| Jun 10, 2025 | Completed final sign-off Jul 2025 | 1624 Filbert St | Bayside Builders Group Inc | apt 3: bathroom remodel. like for like. 42sq ftDetails
apt 3: bathroom remodel. like for like. 42sq ft | $25,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 121 Fair Oaks St | Bayside Builders Group Inc | remodel the (e) common bathroom to add enclosed washer and dryer relocate existing door a per planDetails
remodel the (e) common bathroom to add enclosed washer and dryer relocate existing door a per plan | $30,000 |
| May 30, 2025 | Completed final sign-off Jun 2026 | 365 30th Av | Bayside Builders Group Inc | revision to permit #202503212746: changing dry rot siding like for like back of house, not street visible. exterior siding per inspectors request.Details
revision to permit #202503212746: changing dry rot siding like for like back of house, not street visible. exterior siding per inspectors request. | $1,000 |
| Mar 21, 2025 | Completed final sign-off Jun 2026 | 365 30th Av | Bayside Builders Group Inc | 1200 sq ft woodsiding replacement with james hardie siding in the back of the house only. 7 windows and 1 sliding door replacaement like for like.Details
1200 sq ft woodsiding replacement with james hardie siding in the back of the house only. 7 windows and 1 sliding door replacaement like for like. | $25,000 |
| Mar 6, 2025 | Completed final sign-off Sep 2025 | 638 Edinburgh St | Bayside Builders Group Inc | bathroom remodel like for like 56 sqft.Details
bathroom remodel like for like 56 sqft. | $30,000 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 768 Church St | Bayside Builders Group Inc | unit #4: bathroom remodeling including the change of a tub to walking shower, 35 sqft.Details
unit #4: bathroom remodeling including the change of a tub to walking shower, 35 sqft. | $25,000 |
| Dec 20, 2024 | Completed final sign-off Sep 2025 | 163 Paris St | Bayside Builders Group Inc | kitchen remodel like for like rip and replace demo 2 non bearing walls,Details
kitchen remodel like for like rip and replace demo 2 non bearing walls, | $25,000 |
| Nov 27, 2024 | Completed final sign-off Feb 2025 | 163 Paris St | Bayside Builders Group Inc | 1 bathroom remodel like for like, convert tub to shower (same location).Details
1 bathroom remodel like for like, convert tub to shower (same location). | $30,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 1628 Page St | Bayside Builders Group Inc | non-structural interior remodel to (e) half bath. adding 1 shower. replace toilet. replace sink.Details
non-structural interior remodel to (e) half bath. adding 1 shower. replace toilet. replace sink. | $25,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 2238 46th Av | Bayside Builders Group Inc | rip and replace front stairs to entry. replace conc. treads in kind no structural work.Details
rip and replace front stairs to entry. replace conc. treads in kind no structural work. | $20,000 |
| Jul 18, 2024 | Completed final sign-off Jul 2024 | 165 Shakespeare St | Bayside Builders Group Inc | vinly sliding door at the back of the house. vinyl sliding door at the back 2nd floor. vinyl window guest bathroom. vinyl window side of the house facing the neighbor. u=0.3 max. all are replacement with same size same location of original. all items not visible from streetDetails
vinly sliding door at the back of the house. vinyl sliding door at the back 2nd floor. vinyl window guest bathroom. vinyl window side of the house facing the neighbor. u=0.3 max. all are replacement with same size same location of original. all items not visible from street | $20,000 |
| Jun 27, 2024 | Completed final sign-off Sep 2024 | 165 Shakespeare St | Bayside Builders Group Inc | 2 bathrooms remodel, like for like. appox 100 sq feet totalDetails
2 bathrooms remodel, like for like. appox 100 sq feet total | $30,000 |
| Apr 4, 2024 | Completed final sign-off Sep 2024 | 2238 46th Av | Bayside Builders Group Inc | master bathroom remodel. relocate toilet, shower and vanity. update mep as needed. new tub, 4 new can lights.Details
master bathroom remodel. relocate toilet, shower and vanity. update mep as needed. new tub, 4 new can lights. | $25,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 570 Page St | Bayside Builders Group Inc | unit#4: kitchen remodel.Details
unit#4: kitchen remodel. | $30,000 |
| Mar 8, 2024 | Completed final sign-off May 2024 | 562 38th Av | Bayside Builders Group Inc | windows replacement - like to like. front of house : (2) windows (1) french door. u= .30 maxDetails
windows replacement - like to like. front of house : (2) windows (1) french door. u= .30 max | $5,000 |
| Feb 14, 2024 | Completed final sign-off Feb 2024 | 2850 Cabrillo St | Bayside Builders Group Inc | one skylight replacement like for like same size material glass and metal. flat roof v = .30maxDetails
one skylight replacement like for like same size material glass and metal. flat roof v = .30max | $6,000 |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 562 38th Av | Bayside Builders Group Inc | 700 sq ft siding replacement like for like on the sides only. not visible from the street.Details
700 sq ft siding replacement like for like on the sides only. not visible from the street. | $15,000 |
| Jan 16, 2024 | Completed final sign-off May 2024 | 141 Chenery St | Bayside Builders Group Inc | comply with nov 2021174242: two windows replacement like for like front, original aluminum windows. front. first floor.Details
comply with nov 2021174242: two windows replacement like for like front, original aluminum windows. front. first floor. | $3,000 |
| Dec 14, 2023 | Completed final sign-off Dec 2024 | 179 Concord St | Bayside Builders Group Inc | replace extg front stair like for like. no variances or notice is requried as this is the demo and reconstruction of the front required means of egress in this case. per za bulletin no 4.Details
replace extg front stair like for like. no variances or notice is requried as this is the demo and reconstruction of the front required means of egress in this case. per za bulletin no 4. | $24,000 |
| Dec 12, 2023 | Completed final sign-off Feb 2024 | 2850 Cabrillo St | Bayside Builders Group Inc | 450 sqft siding replacement from wood to wood, like for like. in the front.Details
450 sqft siding replacement from wood to wood, like for like. in the front. | $10,000 |
| Nov 22, 2023 | Completed final sign-off Dec 2023 | 1531 Mckinnon Av | Bayside Builders Group Inc | siding replacement like for like 650 sqft wood exterior at the front of the homeDetails
siding replacement like for like 650 sqft wood exterior at the front of the home | $10,000 |
| Aug 15, 2023 | Completed final sign-off Oct 2023 | 837 Vermont St | Bayside Builders Group Inc | revision to bp #202308013440: revision to correct scope. 2350 sq ft of siding replace in kind to siding (all around wood siding).Details
revision to bp #202308013440: revision to correct scope. 2350 sq ft of siding replace in kind to siding (all around wood siding). | |
| Aug 1, 2023 | Completed final sign-off Oct 2023 | 837 Vermont St | Bayside Builders Group Inc | 2350 sqft of siding replaced to stucco. (all around) repair in kind.Details
2350 sqft of siding replaced to stucco. (all around) repair in kind. | $25,000 |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 345 Upper Tr | Bayside Builders Group Inc | bathroom remodel, like for like. install new vanity. install new tiling. install new fixtures.Details
bathroom remodel, like for like. install new vanity. install new tiling. install new fixtures. | $15,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 81 Frank Norris St | Bayside Builders Group Inc | remodel (1) bathroom like for like 60 sq ft. replace tub, vanity, plumbing fixtures and 5 new recessed lights. lighting shall comply with cec 150.0(k).Details
remodel (1) bathroom like for like 60 sq ft. replace tub, vanity, plumbing fixtures and 5 new recessed lights. lighting shall comply with cec 150.0(k). | $15,000 |
| Jun 1, 2023 | Completed final sign-off Aug 2023 | 21 Alpine Tr | Bayside Builders Group Inc | replace (1) window in the back of the house, like for like, 60inx 82in on the 3rd floor, not visible from street.Details
replace (1) window in the back of the house, like for like, 60inx 82in on the 3rd floor, not visible from street. | $3,000 |
| May 2, 2023 | Expired or cancelled cancelled Jan 2026 | 320 Woodside Av | Bayside Builders Group Inc | garage remodel, replace washer/dryer, new cabinets, replace sink, install recessed lights, relocate meter, upgrade electricalDetails
garage remodel, replace washer/dryer, new cabinets, replace sink, install recessed lights, relocate meter, upgrade electrical | $20,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 447 Nevada St | Bayside Builders Group Inc | remove (e) bath tub and build shower.Details
remove (e) bath tub and build shower. | $10,000 |
| Dec 7, 2022 | Completed final sign-off Jul 2023 | 550 South Van Ness Av | Bayside Builders Group Inc | unit #103: bathroom remodel like for like. tub to walk-in shower.Details
unit #103: bathroom remodel like for like. tub to walk-in shower. | $11,000 |
| Oct 11, 2022 | Completed final sign-off May 2023 | 1001 Pine St | Bayside Builders Group Inc | unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of wallsDetails
unit #1305: 1 kitchen remodel like for like. 1 bathroom remodel like for like. plus floors. no removal of walls | $22,000 |
| Oct 11, 2022 | Completed final sign-off Mar 2023 | 268 Clipper St | Bayside Builders Group Inc | siding replacement from wood to cement boards. approx 1000 sqft.Details
siding replacement from wood to cement boards. approx 1000 sqft. | $20,000 |
| Sep 19, 2022 | Completed final sign-off Apr 2024 | 62 Mullen Av | Expert Home Builders Inc, Bayside Builders Group Inc | bathroom remodel and kitchen remodel/like for like. non-structuralDetails
bathroom remodel and kitchen remodel/like for like. non-structural | $30,000 |
| Sep 19, 2022 | Never finaled issued Sep 2022, no final | 60 Rausch St | Bayside Builders Group Inc | unit 208: master bathroom remodel like for like, adding 2 recessed lights.Details
unit 208: master bathroom remodel like for like, adding 2 recessed lights. | $12,000 |
| Sep 13, 2022 | Completed final sign-off Nov 2022 | 5549 Anza St | Bayside Builders Group Inc | 1 bathroom like for like. replace plumbing. fixtures, update electrical up to code, 2 new r.l. new shower, and replace fan.Details
1 bathroom like for like. replace plumbing. fixtures, update electrical up to code, 2 new r.l. new shower, and replace fan. | $16,000 |
| May 27, 2022 | Expired or cancelled cancelled Oct 2022 | 338 Spear St | Bayside Builders Group Inc | bathroom remodel like for like. replacing all plumbing fixtures, convert tub to shower. update e/m/p up to code, replace light.Details
bathroom remodel like for like. replacing all plumbing fixtures, convert tub to shower. update e/m/p up to code, replace light. | $15,000 |
| Dec 29, 2021 | Completed final sign-off Jan 2022 | 129 Acadia St | Bayside Builders Group Inc | only bolting for foundation retrofit spacing every 4'Details
only bolting for foundation retrofit spacing every 4' | $30,000 |