Liza Evans-Nash
- Listed as
- authorized agent-others, contractor
- Firm
- Mount Street Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2021 to Aug 2025
10 permits since 2000 (contractor on 10 permits, authorized agent-others on 1 permit): 7 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Dec 2025 | 943 Sanchez St | Mount Street Construction | units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unitDetails
units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unit | $700,000 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 5 Las Villas Ct | Mount Street Construction | like for like bathroom remodel.Details
like for like bathroom remodel. | $20,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 378 Chestnut St | Mount Street Construction | 2 bathroom remodels like for likeDetails
2 bathroom remodels like for like | $60,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 3192 Sacramento St | Mount Street Construction | remodel bathroom & laundry hook ups, new wiring in bathroomDetails
remodel bathroom & laundry hook ups, new wiring in bathroom | $55,000 |
| Feb 16, 2023 | Never finaled issued Mar 2023, no final | 7 Edna St | Mount Street Construction | exploritory work to determine the following: orientation size and spacing of ceiling framing at garage level. exisint foundation size and embedded depth at existing grade level. thickness of slab on grade at garage level. if any excavation, to be less than 50 cubic yardsDetails
exploritory work to determine the following: orientation size and spacing of ceiling framing at garage level. exisint foundation size and embedded depth at existing grade level. thickness of slab on grade at garage level. if any excavation, to be less than 50 cubic yards | $3,000 |
| Nov 23, 2022 | Never finaled issued Nov 2022, no final | 2101 Baker St | Mount Street Construction | unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural.Details
unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural. | $15,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 1070 Green St | Mount Street Construction | unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom.Details
unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom. | $5,000 |
| May 17, 2022 | Completed final sign-off Nov 2023 | 1516 Guerrero St | Mount Street Construction | commencement of work not started under previously approved permit appication pa# 201604144784.Details
commencement of work not started under previously approved permit appication pa# 201604144784. | $25,000 |
| Dec 21, 2021 | Completed final sign-off May 2022 | 540 Clement St | Mount Street Construction | tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187Details
tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187 | $122,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 1290 09th Av | Mount Street Construction | renovate front service counterDetails
renovate front service counter | $8,000 |