Dean Shibuya
- Listed as
- architect, authorized agent-others
- Firm
- Dean M. Shibuya Architect
- On San Francisco permits
- Apr 2002 to Aug 2018
9 permits since 2000 (architect on 8 permits, authorized agent-others on 1 permit): 4 completed, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2018 | Expired or cancelled cancelled Jan 2026 | 685 North Point St | install 1 cryosauna and 2 floatation rooms in extg rooms. add skin care facial to 2 exiting rooms.Details
install 1 cryosauna and 2 floatation rooms in extg rooms. add skin care facial to 2 exiting rooms. | $20,000 | |
| Jun 28, 2018 | Expired or cancelled withdrawn Aug 2018 | 685 North Point St | 2 treatment rooms will be used for skin care/facial serviceDetails
2 treatment rooms will be used for skin care/facial service | ||
| Jun 11, 2018 | Expired or cancelled withdrawn Aug 2018 | 685 North Point St | getting a permit to use part of massage establishment as a school of massage.Details
getting a permit to use part of massage establishment as a school of massage. | ||
| Feb 25, 2015 | Completed final sign-off Oct 2015 | 142 Mallorca Wy | Eon Builders Inc | replace existing cabinets, some appliances, remove non structural partition, new flooring, new ceiling, (n) lighting & plumbing fixtures, new paint in kitchen & study. n/a ordinance #155-13Details
replace existing cabinets, some appliances, remove non structural partition, new flooring, new ceiling, (n) lighting & plumbing fixtures, new paint in kitchen & study. n/a ordinance #155-13 | $53,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 2433 Mission St | Astorga Const Company | new wood floors, carpet, interior windows in existing office walls, new built in counters, upgrade electrical systems to code.Details
new wood floors, carpet, interior windows in existing office walls, new built in counters, upgrade electrical systems to code. | $10,000 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 722 Clement St | Eon Builders Inc | change track light fixture from incandescent to low voltage halogen. (reduce wattage from 300 watts to 128 watts. add electrical receptacles. relocate 3 switches. ref pa# 2008/07/01/5705. all work perform in retail space. 1st floor.Details
change track light fixture from incandescent to low voltage halogen. (reduce wattage from 300 watts to 128 watts. add electrical receptacles. relocate 3 switches. ref pa# 2008/07/01/5705. all work perform in retail space. 1st floor. | |
| May 25, 2010 | Never finaled issued May 2010, no final | 685 North Point St | installation of massage platforms in new spa tenant in existing rooms. door removal at existing rooms, widen door to roll in shower, lower grab bar at toilet rm. no structural,electrical, mechanical, or plumbing work. paint.Details
installation of massage platforms in new spa tenant in existing rooms. door removal at existing rooms, widen door to roll in shower, lower grab bar at toilet rm. no structural,electrical, mechanical, or plumbing work. paint. | $10,000 | |
| Jan 26, 2009 | Expired or cancelled cancelled Jan 2026 | 1284 Mcallister St | Details
| $15,000 | |
| Apr 17, 2002 | Completed final sign-off Oct 2002 | 694 28th St | stair modification/revision to app #200009089948Details
stair modification/revision to app #200009089948 | $1,000 |