David Piper
- Listed as
- architect
- On San Francisco permits
- May 2022 to Jul 2026
7 permits since 2000 (architect on 7 permits): 4 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Aug 2026 | 1630 Clay St | Vision Builders | replace siding at front facade. replace windows at front facade. patch repair front portion of roof, replace 8'. replace sheet metol cornice cop at roof.Details
replace siding at front facade. replace windows at front facade. patch repair front portion of roof, replace 8'. replace sheet metol cornice cop at roof. | $60,000 |
| Jul 19, 2024 | Completed final sign-off Jan 2025 | 22 Normandie Tr | Fontana Construction, Inc. | rev 202405081672- structural joists were rotten and require replacmentDetails
rev 202405081672- structural joists were rotten and require replacment | |
| Jun 6, 2024 | In progress issued Jun 2024 | 1 Jade Pl | Rinaldi Construction | revision to pa# 2024-0305-7126 replace rotted posts by steel postDetails
revision to pa# 2024-0305-7126 replace rotted posts by steel post | |
| May 8, 2024 | Completed final sign-off Jan 2025 | 22 Normandie Tr | Fontana Construction, Inc. | remove and replace balcony waterproofing and guardrails.Details
remove and replace balcony waterproofing and guardrails. | $22,000 |
| Mar 5, 2024 | In progress issued Mar 2024 | 1 Jade Pl | Rinaldi Construction | southwest facade restore located at the rear . remove and replace cement plaster, all windows and portion of roofing. replace interior associated finishes as neededDetails
southwest facade restore located at the rear . remove and replace cement plaster, all windows and portion of roofing. replace interior associated finishes as needed | $100,000 |
| Dec 2, 2022 | Completed final sign-off May 2023 | 66 Saint Elmo Wy | Juan Vazquez | primary bathroom remodel and installing w/d in current closet. bathroom and laundry room are located on the 3rd flr. both are at the rear of home. bathroom is 86 sqft and the laundry room is 15 sqft. all work is in the current envelope of home. not moving existing walls.Details
primary bathroom remodel and installing w/d in current closet. bathroom and laundry room are located on the 3rd flr. both are at the rear of home. bathroom is 86 sqft and the laundry room is 15 sqft. all work is in the current envelope of home. not moving existing walls. | $20,400 |
| May 3, 2022 | Completed final sign-off Apr 2023 | 3350 Laguna St | Robert L Brown Construction Inc. | street facing facade only: remove and replace cement, plaster decorative trim in-kind. remove and replace 15 windows (levels 2-4) fiberglass windows same size and location.Details
street facing facade only: remove and replace cement, plaster decorative trim in-kind. remove and replace 15 windows (levels 2-4) fiberglass windows same size and location. | $64,000 |