William Macoonough & Partners
- License
- C28009
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- William Mcdonough & Partners
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Sep 2014
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Swinerton Builders (4)
- Engineers
- Jeffrey Setera
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2014 | Completed final sign-off Sep 2015 | 333 Brannan St | Swinerton Builders | added communicating openings with 345 brannan & ab 010 form; revised 333 bldg facade @ property line to coordinate with 345 brannan expansion joint. base bldg elec room moved from roof to 5th fl. ramp, stair & egress path changed @ courtyard. change to roof landscape design & lighting. adjustment toDetails
added communicating openings with 345 brannan & ab 010 form; revised 333 bldg facade @ property line to coordinate with 345 brannan expansion joint. base bldg elec room moved from roof to 5th fl. ramp, stair & egress path changed @ courtyard. change to roof landscape design & lighting. adjustment to | $195,000 |
| Sep 19, 2013 | Completed final sign-off Mar 2015 | 333 Brannan St | Swinerton Builders | demolish one story workshop & office. (bldg# 1) maher: compliance with ordinance no. 155-13 not required. see attached.Details
demolish one story workshop & office. (bldg# 1) maher: compliance with ordinance no. 155-13 not required. see attached. | $68,000 |
| Sep 19, 2013 | Completed final sign-off Mar 2015 | 333 Brannan St | Swinerton Builders | compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. demolish one story vehicle storage. (bldg# 2)Details
compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. demolish one story vehicle storage. (bldg# 2) | $30,000 |
| Jun 28, 2013 | Completed final sign-off Oct 2015 | 333 Brannan St | Swinerton Builders | to erect 6 stories, 1 basement, (commercial) office, retail & parking building.Details
to erect 6 stories, 1 basement, (commercial) office, retail & parking building. | $30,000,000 |