Tommy Fong

License
C28106
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Marx Okybo Associates Inc
Based in
Sf
On San Francisco permits
Dec 2018 to Jun 2026

4 permits since 2000 (architect on 4 permits): 2 completed, 1 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Saarman Construction,Ltd. (2), Gar Construction Inc
Engineers
Jason G Coray

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 30, 2026In progress
issued Jul 2026
2898 Vallejo StGar Construction Incinterior only sofy demo only, removes all interior wall finishes & fanestration, all wall studs and structural remain, remove all floor finishes, all fl framing & structure remain. remove light fixture, mep system, sprinkler, hot tub, and pool equipment, main electrical service panel to remain
Details
Permit
202606304360
Permit issued
Jul 9, 2026

interior only sofy demo only, removes all interior wall finishes & fanestration, all wall studs and structural remain, remove all floor finishes, all fl framing & structure remain. remove light fixture, mep system, sprinkler, hot tub, and pool equipment, main electrical service panel to remain

Open the permit page

$100,000
Mar 13, 2020Completed
final sign-off Nov 2020
1 Church Stremove (e) upper vehicle gate. furnish & install new upper vehicle gate. remove (e) lower vehicle gate. furnish and install 2 swing gates & operators. to comply with complaint 201864931 items 4 & 8
Details
Permit
202003137047
Permit issued
Apr 29, 2020
Final sign-off
Nov 16, 2020

remove (e) upper vehicle gate. furnish & install new upper vehicle gate. remove (e) lower vehicle gate. furnish and install 2 swing gates & operators. to comply with complaint 201864931 items 4 & 8

Open the permit page

$42,000
Feb 15, 2019Completed
final sign-off Dec 2019
1 Church StSaarman Construction,Ltd.priority plan review. add scope to permit #201806222691. accessibility unit upgrades.
Details
Permit
201902153108
Permit issued
Mar 22, 2019
Final sign-off
Dec 13, 2019

priority plan review. add scope to permit #201806222691. accessibility unit upgrades.

Open the permit page

$1,800,000
Dec 4, 2018Never finaled
issued Dec 2018, no final
1 Church StSaarman Construction,Ltd.addition of scope to permit #201806222691. plywood replacement from p.t to structural plywood. all other structural work to be in-kind. new struct work per sheets s-1.01 thru s-4.10. n/a for maher.
Details
Permit
201812047372
Permit issued
Dec 4, 2018

addition of scope to permit #201806222691. plywood replacement from p.t to structural plywood. all other structural work to be in-kind. new struct work per sheets s-1.01 thru s-4.10. n/a for maher.

Open the permit page

$300,000