David Cefali
- License
- S3658
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3658 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Cefali & Assoc
- Based in
- Studio City
- On San Francisco permits
- Aug 2015 to Aug 2015
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Swinerton Builders (3)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2015 | Completed final sign-off Dec 2017 | 1525 Pine St | Swinerton Builders | temporary shoring & underpinning for new construction (ref: 2013-12-3-3256s).Details
temporary shoring & underpinning for new construction (ref: 2013-12-3-3256s). | $130,000 |
| Aug 3, 2015 | Completed final sign-off Dec 2017 | 1545 Pine St | shoring & tiebacks for new construction (ref: 2013-12-3-3256s).Details
shoring & tiebacks for new construction (ref: 2013-12-3-3256s). | $260,000 | |
| Aug 3, 2015 | Completed final sign-off Dec 2017 | 1553 Pine St | Swinerton Builders | temporary shoring & underpinning for new construction (ref: 2013-12-3-3256s).Details
temporary shoring & underpinning for new construction (ref: 2013-12-3-3256s). | $195,000 |
| Aug 3, 2015 | Completed final sign-off Dec 2017 | 1545 Pine St | Swinerton Builders | shoring & tiebacks for new construction (ref: 2013-12-3-3256s).Details
shoring & tiebacks for new construction (ref: 2013-12-3-3256s). | $1,100,000 |