Daniel Mullin
- License
- C24705
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Dk Mullin Arch
- Based in
- Moscow
- On San Francisco permits
- May 2011 to May 2026
3 permits since 2000 (architect on 3 permits): 1 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mclennan Construction (2), Alain Hirsch Construction Corp
- Engineers
- Peter A. Leptuch
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress issued Jul 2026 | 141 Kearny St | Mclennan Construction | change of use, tenant improvement for planet fitness: includes locker rooms, showers, bathrooms, workout areas, reception, tanning & massage and utility rooms. deferred submittals fire alarm, fire sprinkler, exterior signs.Details
change of use, tenant improvement for planet fitness: includes locker rooms, showers, bathrooms, workout areas, reception, tanning & massage and utility rooms. deferred submittals fire alarm, fire sprinkler, exterior signs. | $1,500,000 |
| Jan 6, 2026 | Completed final sign-off Sep 2026 | 141 Kearny St | Mclennan Construction | partial interior demolition at previuos tenant improvement on basement, ground floor and intermidiate levels in preparations for planet fintness, including removal of interior wall partitions, lights, ceilings ductwork, restrooms and abandoned utilities. all (e) utilities service connections are..Details
partial interior demolition at previuos tenant improvement on basement, ground floor and intermidiate levels in preparations for planet fintness, including removal of interior wall partitions, lights, ceilings ductwork, restrooms and abandoned utilities. all (e) utilities service connections are.. | $20,000 |
| May 26, 2011 | Never finaled issued Jun 2011, no final | 216 Stockton St | Alain Hirsch Construction Corp | interior non structural demo of existing retail store. all work to comply with ab-017.Details
interior non structural demo of existing retail store. all work to comply with ab-017. | $17,000 |