Wood Rodgers
- License
- 49957
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- On San Francisco permits
- Oct 2009 to May 2010
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Trinet Construction (3)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2010 | Completed final sign-off Jan 2011 | 320 Clementina St | Trinet Construction | revision to pa# 2009.12.18.3488. install an 18" x 18" drainage inlet in front yard , and 63 lf of 8". drain line from drainage inlet to (e) catch basin.Details
revision to pa# 2009.12.18.3488. install an 18" x 18" drainage inlet in front yard , and 63 lf of 8". drain line from drainage inlet to (e) catch basin. | $10,000 |
| Dec 18, 2009 | Completed final sign-off Jan 2011 | 320 Clementina St | Trinet Construction | public housing. site improvements including courtyard paving, landscape irrigation system,outdoor amenities, metal fence, accessible entrance and loadin area, outdoor lighting. replace existing ventry canopy, sidewalk replacement with handicapped ramp.Details
public housing. site improvements including courtyard paving, landscape irrigation system,outdoor amenities, metal fence, accessible entrance and loadin area, outdoor lighting. replace existing ventry canopy, sidewalk replacement with handicapped ramp. | $458,000 |
| Oct 21, 2009 | Completed final sign-off Feb 2011 | 320 Clementina St | Trinet Construction | replace 160 l.f. of underground 3" galvanized steel fire line with new 3" cupper pipe.Details
replace 160 l.f. of underground 3" galvanized steel fire line with new 3" cupper pipe. | $45,000 |