Cyrus Mashhoodi
- Listed as
- architect, engineer
- On San Francisco permits
- Oct 2005 to Oct 2025
6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 10, 2025 | Completed final sign-off Feb 2026 | 3232 21st St | Bmt 13 Construction Inc | unit #4: remodel kitchen and add hood duct/soffit only.Details
unit #4: remodel kitchen and add hood duct/soffit only. | $25,000 |
| Nov 21, 2024 | Completed final sign-off Jan 2025 | 790 Arkansas St | Barragan Builders | revision to pa# 2023-0202-1294 closing interior door way remove special inspection item 1, sampling.Details
revision to pa# 2023-0202-1294 closing interior door way remove special inspection item 1, sampling. | |
| May 8, 2023 | Completed final sign-off Oct 2023 | 35 Mangels Av | American Home Services | revision to permit 202304034900. details of wall next to neighbor.Details
revision to permit 202304034900. details of wall next to neighbor. | |
| Mar 16, 2023 | Expired or cancelled withdrawn Apr 2023 | 35 Mangels Av | American Home Services | partial foundation replacement. remodel within the building envelope on 1st fl including a bedroom and a full bath & 1/2 bath.Details
partial foundation replacement. remodel within the building envelope on 1st fl including a bedroom and a full bath & 1/2 bath. | $42,000 |
| Jun 10, 2010 | Completed final sign-off Dec 2010 | 3964 19th St | Barrera & Associates Construction Inc | excavation & drainage system for a 8' high retain wall to be constructed @ adjacent lot at rear.Details
excavation & drainage system for a 8' high retain wall to be constructed @ adjacent lot at rear. | $2,000 |
| Oct 26, 2005 | Completed final sign-off Feb 2006 | 870 Church St | remove non bearing shear wall. replace it with a simpson strong wall. remodel (e) bath. add a new bathroom within floor plan.Details
remove non bearing shear wall. replace it with a simpson strong wall. remodel (e) bath. add a new bathroom within floor plan. | $20,000 |