Curtis Moradkhani
- Listed as
- engineer
- On San Francisco permits
- Aug 2023 to Aug 2023
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2023 | Completed final sign-off Sep 2024 | 155 Bay Shore Bl | remove 239 ft of (e) chain link fence & replace w/non-conductive safe fence flank. extend 268 ft of (e) fence from 8 ft to 10 ft with 2 ft safe fence. replace 2 (e) 25 ft double swing gate with non-conductive. remove 1 man gate & 2 single leaf fates & replace with non-conductiveDetails
remove 239 ft of (e) chain link fence & replace w/non-conductive safe fence flank. extend 268 ft of (e) fence from 8 ft to 10 ft with 2 ft safe fence. replace 2 (e) 25 ft double swing gate with non-conductive. remove 1 man gate & 2 single leaf fates & replace with non-conductive | $200,000 |