Courtenay Dill Glander
- Listed as
- architect, authorized agent-others
- Firm
- Cdg Architecture
- Based in
- San Rafael
- On San Francisco permits
- Nov 2015 to Mar 2026
7 permits since 2000 (architect on 7 permits, authorized agent-others on 1 permit): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2026 | Completed final sign-off Jun 2026 | 300 Magellan Av | Terence Mcmahon Construction | revision to pa #202602206255. temporary remove bricks to access the framed stair below. replace any dry rot wood or framing in kind. rewaterproof stair, lay existing brick. in same location pattern as existing.Details
revision to pa #202602206255. temporary remove bricks to access the framed stair below. replace any dry rot wood or framing in kind. rewaterproof stair, lay existing brick. in same location pattern as existing. | |
| Jan 19, 2023 | Never finaled issued Jan 2023, no final | 249 Hoffman Av | John Charles Hill | 3rd fl -kitchen remodein extg kitchen location: cabinets, appliances, counters, elect & plmg. bath remodel: full bath remodel in extg location 277sf. 4th fl-1/2 bath remodel: toilet & lav. laundry: add stacked washer and dryer, 50 sf. to comply with nov #202298132Details
3rd fl -kitchen remodein extg kitchen location: cabinets, appliances, counters, elect & plmg. bath remodel: full bath remodel in extg location 277sf. 4th fl-1/2 bath remodel: toilet & lav. laundry: add stacked washer and dryer, 50 sf. to comply with nov #202298132 | $65,000 |
| Nov 23, 2022 | Completed final sign-off Jun 2023 | 350 Broderick St | Terence Mcmahon Construction | unit 320 -new partition wall 2 x 4 with gym to make bedroom. new door, new outlet and recess lights.Details
unit 320 -new partition wall 2 x 4 with gym to make bedroom. new door, new outlet and recess lights. | $5,000 |
| Oct 6, 2022 | Completed final sign-off Mar 2023 | 1818 Divisadero St | Zebra Awning Co Inc | install 1 non-electric, projecting awning sign. (atelier yarns)Details
install 1 non-electric, projecting awning sign. (atelier yarns) | $7,000 |
| Oct 6, 2022 | Completed final sign-off Mar 2023 | 1818 Divisadero St | Terence Mcmahon Construction | add privacy partition wall to staff area with door. add kitchenette: sink, microwave, fridge, outlets, cabinets. add outlets at cash wrap + other required locations. add awning under separate permit.Details
add privacy partition wall to staff area with door. add kitchenette: sink, microwave, fridge, outlets, cabinets. add outlets at cash wrap + other required locations. add awning under separate permit. | $10,000 |
| Mar 11, 2022 | Completed final sign-off May 2023 | 217 Cumberland St | Phase 2 Builders | remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations.Details
remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations. | $120,000 |
| Nov 16, 2015 | Completed final sign-off Nov 2016 | 95 Seward St | remodel (e) laundry room to bathroom - all (e) space; remove window. add lavatory, toilet & shower, new lights & fan; add skylightDetails
remodel (e) laundry room to bathroom - all (e) space; remove window. add lavatory, toilet & shower, new lights & fan; add skylight | $15,000 |