Consuelo Crosby
- Listed as
- architect, engineer
- Firm
- The Edifice Complex
- Based in
- Oakland
- On San Francisco permits
- Nov 2013 to May 2025
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 2 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 22, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | revision 202501148315- to include (n) rear sliders from 72 inch width to 96 inch width, add strong walls, 2x (n) skylights to match skylights on original permit, (n) detail for (e) as built condition at upper double top plates.Details
revision 202501148315- to include (n) rear sliders from 72 inch width to 96 inch width, add strong walls, 2x (n) skylights to match skylights on original permit, (n) detail for (e) as built condition at upper double top plates. | |
| Jan 14, 2025 | Completed final sign-off May 2026 | 421 Oak Park Dr | Ly Green Construction Inc | remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors.Details
remodel (e) kitchen with vaulted ceiling, new layout, appliances. remodel (e) 1st fl beyond garage w family room, new bedroom, new bath, remodel (e) laundry. remodel in keeping w precedent set by neighboring residences. replace (e) first floor window and door w/ (n) sliding doors. | $250,000 |
| Apr 29, 2016 | Expired or cancelled cancelled Aug 2019 | 655 18th Av | voluntary lateral upgrade at ground floor of existing building. added new shear panels with anchor bolts, clips, ply wood, new hardware connections at extg post and beam framing.Details
voluntary lateral upgrade at ground floor of existing building. added new shear panels with anchor bolts, clips, ply wood, new hardware connections at extg post and beam framing. | $20,000 | |
| Nov 20, 2013 | Never finaled issued Jun 2014, no final | 1936 Folsom St | voluntary seismic upgrade construction of entry 1st level garage foundation, shearwallsDetails
voluntary seismic upgrade construction of entry 1st level garage foundation, shearwalls | $50,000 | |
| Nov 1, 2013 | Expired or cancelled withdrawn May 2018 | 1936 Folsom St | G Family Incorporated | from single family to multi family unit conversion. reconfigure 2nd story entry. rehabilitate 3rd fl unit & add a dormer.Details
from single family to multi family unit conversion. reconfigure 2nd story entry. rehabilitate 3rd fl unit & add a dormer. | $87,000 |