Hughes Thompson
- Listed as
- architect, engineer
- Firm
- Hughes Thompson Of Greenberg
- Based in
- San Mateo
- On San Francisco permits
- Sep 2006 to Mar 2018
9 permits since 2000 (engineer on 7 permits, architect on 2 permits): 7 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2018 | Completed final sign-off Jan 2023 | 1569 48th Av | R M N Builder | horizontal addition front unit. no alterations to front elevation. expand unit toward your yard approx 8'. new foundation, framing, roof, siding. all new interiors, kitchen, bath, floring, doors, etc.Details
horizontal addition front unit. no alterations to front elevation. expand unit toward your yard approx 8'. new foundation, framing, roof, siding. all new interiors, kitchen, bath, floring, doors, etc. | $100,000 |
| Mar 5, 2018 | Completed final sign-off Dec 2022 | 1569 48th Av | R M N Builder | rear building. remove 3rd floow walls & pitched roof & replace with (n) 9' high walls & flat roof. all (n) interior buildout including kitchen, bath, plumbing, electric, doors, windows, flooring. convert to own dwelling unit, revision to bpa# 2017-1120-4413 for 2nd fl layout.Details
rear building. remove 3rd floow walls & pitched roof & replace with (n) 9' high walls & flat roof. all (n) interior buildout including kitchen, bath, plumbing, electric, doors, windows, flooring. convert to own dwelling unit, revision to bpa# 2017-1120-4413 for 2nd fl layout. | $120,000 |
| Jan 10, 2018 | Expired or cancelled expired Mar 2019 | 1569 48th Av | seismic retrofit at rear bld. replace & install portion of footing, install hold downs, install shear wall, joists @ 3rd floor. top plate @ 2nd flr walls/ beam at 1stDetails
seismic retrofit at rear bld. replace & install portion of footing, install hold downs, install shear wall, joists @ 3rd floor. top plate @ 2nd flr walls/ beam at 1st | $20,000 | |
| Apr 30, 2015 | Completed final sign-off Jun 2017 | 811 Capp St | convert workspace to dwelling unit. add kitchen & shower. add (3) fire rated 45min fixed windows (2) 5-0 x 4-o h (1) 2-043-0hDetails
convert workspace to dwelling unit. add kitchen & shower. add (3) fire rated 45min fixed windows (2) 5-0 x 4-o h (1) 2-043-0h | $4,000 | |
| Mar 3, 2014 | Completed final sign-off Apr 2016 | 401 Lake St | seismic upgrade to soft story. install shear walls, hold downs, and steel cross bracing.Details
seismic upgrade to soft story. install shear walls, hold downs, and steel cross bracing. | $27,000 | |
| Jul 18, 2013 | Completed final sign-off Sep 2014 | 31 El Sereno Ct | John Mc Govern | deck addition.Details
deck addition. | $30,000 |
| Apr 18, 2013 | Completed final sign-off Dec 2015 | 2451 19th Av | Kmh Construction Company | erect 2-story single family type v building.Details
erect 2-story single family type v building. | $350,000 |
| May 29, 2009 | Completed final sign-off Aug 2009 | 890 Market St | Davaco Inc. | 1st & 2nd fls - new paint, lighting, flooring, removal of shelving with fixed shelving. 2nd floor-mens-new lighting. 2nd floor-kids: new paint on sales wall & upgrading restrooms to comply with handicapped accessibility.Details
1st & 2nd fls - new paint, lighting, flooring, removal of shelving with fixed shelving. 2nd floor-mens-new lighting. 2nd floor-kids: new paint on sales wall & upgrading restrooms to comply with handicapped accessibility. | $178,000 |
| Sep 11, 2006 | Expired or cancelled expired Mar 2008 | 70 Nebraska St | Jimenez Construction Sf Inc | main floor remodel - new bath, new stairs, new bathroom, new music room, new family room, lightwell infill. foundation detail for moment frame at garage door.Details
main floor remodel - new bath, new stairs, new bathroom, new music room, new family room, lightwell infill. foundation detail for moment frame at garage door. | $80,000 |