- Jan 2021 to Aug 2022
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2022 | Completed final sign-off Sep 2022 | 1223 Webster St | Saarman Construction,Ltd. | install tie-back roof anchor design for building 'a'. new scope of work is to design, manufactture and install 12 rooftop anchors atop building a to facilitate exterior window washing. structural calculations for the design of the structurual tie back roof anchors are included.Details
install tie-back roof anchor design for building 'a'. new scope of work is to design, manufactture and install 12 rooftop anchors atop building a to facilitate exterior window washing. structural calculations for the design of the structurual tie back roof anchors are included. | $49,000 |
| Apr 4, 2022 | Completed final sign-off Dec 2022 | 1223 Webster St | Saarman Construction,Ltd. | bldg a 1st fl: convert (e) open concept staff room-kitchenette & (e) closet into 3 (n) staff meeting rooms. (n) closet, (n) office for maintenance staff. demo of (e) walls & (e) kitchen sink. install metal framing stud & track, drywall, skim walls & ceiling. tape to level 3 finish.Details
bldg a 1st fl: convert (e) open concept staff room-kitchenette & (e) closet into 3 (n) staff meeting rooms. (n) closet, (n) office for maintenance staff. demo of (e) walls & (e) kitchen sink. install metal framing stud & track, drywall, skim walls & ceiling. tape to level 3 finish. | $95,700 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1223 Webster St | Saarman Construction,Ltd. | revision to bpa 202101223118 with regard to windows. revised plan is to permanently remove the existing lower metal window grills. lower window panes will be replaced with obscured glass for privacy. max u factor = 0.36, replacement in-kind/same sizeDetails
revision to bpa 202101223118 with regard to windows. revised plan is to permanently remove the existing lower metal window grills. lower window panes will be replaced with obscured glass for privacy. max u factor = 0.36, replacement in-kind/same size | |
| Jan 22, 2021 | Completed final sign-off Sep 2022 | 1223 Webster St | Saarman Construction,Ltd. | exterior building envelope repairs. remove/replace roofing membrane system at tower bldg, composition roofing at townhouse bldgs. window waterproof/repairs at tower bldg. replace windows at townhouse bldgs. selective stucco repairs all bldgs. waterproof repairs at podium decks... all like-for-likeDetails
exterior building envelope repairs. remove/replace roofing membrane system at tower bldg, composition roofing at townhouse bldgs. window waterproof/repairs at tower bldg. replace windows at townhouse bldgs. selective stucco repairs all bldgs. waterproof repairs at podium decks... all like-for-like | $5,289,000 |