Chris Leon
- Listed as
- engineer
- On San Francisco permits
- Aug 2022 to Aug 2022
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2022 | Completed final sign-off May 2024 | 311 West Portal Av | Lyon Restoration Inc Dba Service Team Of | partial reconstruction to roof framing, interior finish replacement. demo (e) non-accessible restroom. upgrade to accessible unisex restroom. install 1 hvac rooftop package unit. rewire lighting. replace 1 (e) subpanel. relocate 1 (e) subpanel. upgrade drinking fountain. add handrail to (e) stairs.Details
partial reconstruction to roof framing, interior finish replacement. demo (e) non-accessible restroom. upgrade to accessible unisex restroom. install 1 hvac rooftop package unit. rewire lighting. replace 1 (e) subpanel. relocate 1 (e) subpanel. upgrade drinking fountain. add handrail to (e) stairs. | $650,000 |