Chong Hong
- License
- C84784
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C84784 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Jan 2022 to Aug 2024
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 1 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Alan Wong Construction Inc
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2024 | Completed final sign-off Apr 2025 | 124 Whittier St | Alan Wong Construction Inc | 2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinetsDetails
2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinets | $40,000 |
| Apr 18, 2023 | Expired or cancelled withdrawn Aug 2024 | 605 Jackson St | change of occupany from m to b. t.i. to drink shop: boba shop(to go only). interior remodel: electrical work for (n) equipment. plumbing work to (n) sinks, counter tops, entrance upgrade. (e) bldg does not have fire sprinklers system. front entry improvements.Details
change of occupany from m to b. t.i. to drink shop: boba shop(to go only). interior remodel: electrical work for (n) equipment. plumbing work to (n) sinks, counter tops, entrance upgrade. (e) bldg does not have fire sprinklers system. front entry improvements. | $15,000 | |
| Jan 28, 2022 | Never finaled issued Feb 2022, no final | 271 Flournoy St | convert ground floor into living space. remove wall at 2nd fl. open space for dining room. new spiral stair to ground floor.Details
convert ground floor into living space. remove wall at 2nd fl. open space for dining room. new spiral stair to ground floor. | $60,000 |