Cheng-Jung Chang
- Listed as
- engineer
- Firm
- Pg&E Dept. Of Engineering
- On San Francisco permits
- Nov 2013 to Nov 2020
3 permits since 2000 (engineer on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2020 | Completed final sign-off May 2021 | 1570 Bay St | Monterey Mechanical Co | installation of new 8' high steel swing gate for pc&e marina substation.Details
installation of new 8' high steel swing gate for pc&e marina substation. | $65,000 |
| Feb 26, 2014 | Completed final sign-off Jul 2014 | 405 Folsom St | construction partition wall between transformer 2 & 12 to protect them, the wall will be 20' height, 17 long & 1' wide - pre cast refinforced refactory concrete panels & columns wiht the top being supported to the wall with steel bracings.Details
construction partition wall between transformer 2 & 12 to protect them, the wall will be 20' height, 17 long & 1' wide - pre cast refinforced refactory concrete panels & columns wiht the top being supported to the wall with steel bracings. | $100,000 | |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 1059 Evans Av | Anvil Builders Inc | trench for new perforated pipe. form and shotcrete new wall on slope. remove and replace fenceDetails
trench for new perforated pipe. form and shotcrete new wall on slope. remove and replace fence | $90,000 |