Chau Myra Tran
- Listed as
- contractor, designer
- Firm
- M C Tran Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Jun 2024
8 permits since 2000 (contractor on 8 permits, designer on 1 permit): 8 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Designers
- Hawk Lee
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 355 Ralston St | M C Tran Construction | 2nd floor: remodel (e) kitchen and replace front facing windows. front windows to be alumium clad woodDetails
2nd floor: remodel (e) kitchen and replace front facing windows. front windows to be alumium clad wood | $30,000 |
| Jan 25, 2023 | Completed final sign-off May 2023 | 115 Brazil Av | M C Tran Construction | revision to bpa#202210114096, reduce scope of work from (4) bathrooms to (2) bathroomsDetails
revision to bpa#202210114096, reduce scope of work from (4) bathrooms to (2) bathrooms | |
| Oct 11, 2022 | Completed final sign-off May 2023 | 115 Brazil Av | M C Tran Construction | build a full bath in the extg bedroom #1 and extg dining room in unit #117 brazil. build a full bath in the extg bedroom #2 and extg dining room in unit #115. please see scope of work in proposed plan.Details
build a full bath in the extg bedroom #1 and extg dining room in unit #117 brazil. build a full bath in the extg bedroom #2 and extg dining room in unit #115. please see scope of work in proposed plan. | $50,000 |
| Jun 29, 2022 | Completed final sign-off Sep 2022 | 115 Brazil Av | M C Tran Construction | 2 unit bldg duplex. remodel extg kitchen in both 2 units. replace new cabinets, nw exhaust fan, new sink, new floor, new faucet. non structure. kitchen are approx 150 sq ft, light cieling. new counter. 3 recptacles.Details
2 unit bldg duplex. remodel extg kitchen in both 2 units. replace new cabinets, nw exhaust fan, new sink, new floor, new faucet. non structure. kitchen are approx 150 sq ft, light cieling. new counter. 3 recptacles. | $10,500 |
| Jun 9, 2017 | Completed final sign-off Mar 2018 | 1031 Rivera St | M C Tran Construction | infill open space under existing floor habitable area. add 2 bedrroms. family room & two full bath rooms @ 1st floor per planDetails
infill open space under existing floor habitable area. add 2 bedrroms. family room & two full bath rooms @ 1st floor per plan | $57,600 |
| Jun 22, 2016 | Completed final sign-off Mar 2018 | 235 Country Club Dr | M C Tran Construction | one new family room with laundry, master bath and bedroom, 1/2 bath to be constructed at ground floor.Details
one new family room with laundry, master bath and bedroom, 1/2 bath to be constructed at ground floor. | $60,000 |
| Apr 19, 2016 | Completed final sign-off May 2016 | 1440 Jones St | M C Tran Construction | comply with n.o.v. #201609191 item #2 - repair stairs in kind less than 50%.Details
comply with n.o.v. #201609191 item #2 - repair stairs in kind less than 50%. | $750 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 3287 Cesar Chavez St | M C Tran Construction | relocate kitchen, add (n) bathroom, and remodel (e) bathroom on 2ns floor. infill light court on 2nd flr. add skylightDetails
relocate kitchen, add (n) bathroom, and remodel (e) bathroom on 2ns floor. infill light court on 2nd flr. add skylight | $45,000 |