Charles Davis
- Listed as
- architect
- Firm
- Ehdd Architects
- On San Francisco permits
- Aug 2006 to Jun 2012
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2012 | Completed final sign-off Aug 2013 | 3180 18th St | Peacock Construction Inc | interior refurbishment of bldg corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. no structural work, deferred submittals for mechanical, electrical including lighting, fire/life safety).Details
interior refurbishment of bldg corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. no structural work, deferred submittals for mechanical, electrical including lighting, fire/life safety). | $300,000 |
| Jul 7, 2011 | Completed final sign-off Dec 2011 | 2615 Divisadero St | Michael Gaul General Contractors | revision to pa #201004301513: additional work to (e) permit. interior wall removal. kitchen remodelDetails
revision to pa #201004301513: additional work to (e) permit. interior wall removal. kitchen remodel | $70,000 |
| Aug 23, 2006 | Completed final sign-off Jun 2007 | 2615 Divisadero St | Michael Gaul General Contractors | removable roof deck installed over (e) flat roof with new access door. remodel (e) bathroom. flourescent light in bath, other lights controlled by o.s.Details
removable roof deck installed over (e) flat roof with new access door. remodel (e) bathroom. flourescent light in bath, other lights controlled by o.s. | $65,000 |