Casey Weeks
- Listed as
- contractor, designer
- Firm
- Focal Point Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Dec 2022 to Dec 2022
1 permit since 2000 (contractor on 1 permit, designer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2022 | Completed final sign-off Sep 2023 | 1101 Green St | Focal Point Construction | 14/f #1404: interior alteration includes remodel bathroom, replace fixtures in kind, remove door and fill-in wall. remove portion of non-bearing wall between dining & living room.Details
14/f #1404: interior alteration includes remodel bathroom, replace fixtures in kind, remove door and fill-in wall. remove portion of non-bearing wall between dining & living room. | $40,000 |