Carter Pierce
- Listed as
- authorized agent-others, contractor
- Firm
- California Environmental Systems Inc
- Based in
- Auburn
- On San Francisco permits
- Dec 2021 to Nov 2025
2 permits since 2000 (contractor on 2 permits, authorized agent-others on 1 permit): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Brad Rollins
- Engineers
- Ryan Sprangers
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2025 | Completed final sign-off Jun 2026 | 3565 California St | California Environmental Systems Inc | replace 2 rooftop hvac units same location, 1) 4 ton, 1) 3 tonDetails
replace 2 rooftop hvac units same location, 1) 4 ton, 1) 3 ton | $33,205 |
| Dec 29, 2021 | Never finaled filed Dec 2021, never issued | 4610 Mission St | California Environmental Systems Inc | roof: install (3) new hvac units with same capacity.retrofit (e) controls.new roof curb to isolate vibration.extend (e) mezz for maintenance access.damper actuators will be new electric and tied to (n) ddc system.Details
roof: install (3) new hvac units with same capacity.retrofit (e) controls.new roof curb to isolate vibration.extend (e) mezz for maintenance access.damper actuators will be new electric and tied to (n) ddc system. | $325,000 |