Bruno Korbmacher
- License
- C45888
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C45888 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2022 to Sep 2025
12 permits since 2000 (engineer on 12 permits): 10 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Foundation Soil Stabilization (9), Eastwood Development Incorporated (2), Tn Building
Where they worked
- Single-family 8
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 5838 California St | Foundation Soil Stabilization | soil stabilization for permeation grouting of the soils along the xisting foundationDetails
soil stabilization for permeation grouting of the soils along the xisting foundation | $8,400 |
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 5824 California St | Foundation Soil Stabilization | soil stabilization for permeation grouting of the soils along the existing foundation.Details
soil stabilization for permeation grouting of the soils along the existing foundation. | $8,400 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 118 16th Av | Foundation Soil Stabilization | grouting of the soils along the existing foundation.Details
grouting of the soils along the existing foundation. | $7,862 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 130 16th Av | Foundation Soil Stabilization | obtain planning and building permit for permeation grouting of the soils along the existing foundation.Details
obtain planning and building permit for permeation grouting of the soils along the existing foundation. | $7,862 |
| Dec 4, 2024 | Completed final sign-off Jul 2025 | 774 Natoma St | Foundation Soil Stabilization | soil stabilization with permeation grouting at edge of the foundation footing. fssi soil stabilization plans job number 5541-24 dated 10/30/2024. korbacher statement of planned operation dated 11/20/2024. property owners consent letter dated 10/01/2024Details
soil stabilization with permeation grouting at edge of the foundation footing. fssi soil stabilization plans job number 5541-24 dated 10/30/2024. korbacher statement of planned operation dated 11/20/2024. property owners consent letter dated 10/01/2024 | $8,833 |
| Dec 4, 2024 | Completed final sign-off Jul 2025 | 764 Natoma St | Foundation Soil Stabilization | soil stabilization with permeation grouting at edge of the foundation footing. fssi soil stabilization plans job number 5541-24 dated 10/28/2024. korbacher statement of planned operation dated 11/21/2024. property owners consent letter dated 10/20/2024Details
soil stabilization with permeation grouting at edge of the foundation footing. fssi soil stabilization plans job number 5541-24 dated 10/28/2024. korbacher statement of planned operation dated 11/21/2024. property owners consent letter dated 10/20/2024 | $8,833 |
| Nov 20, 2024 | In progress filed Nov 2024, not yet issued | 2266 48th Av | Foundation Soil Stabilization | soil stabilization w/ permeation grouting @ edge of foundation footing. fssi soil stabilization plans job# 5533-24 dated 10/23/24. korbacher statement of planned operations dated 11/14/24. property owner consent letter dated 8/26/24.Details
soil stabilization w/ permeation grouting @ edge of foundation footing. fssi soil stabilization plans job# 5533-24 dated 10/23/24. korbacher statement of planned operations dated 11/14/24. property owner consent letter dated 8/26/24. | $7,500 |
| Nov 20, 2024 | In progress issued Nov 2024 | 2258 48th Av | Foundation Soil Stabilization | soil stabilization w/ permeation grouting @ edge of foundation footing. fssi soil stabilization plans job# 5533-24 dated 10/22/24. korbacher statement of planned operations dated 11/13/24. property owner consent letter dated 9/27/24. no exterior workDetails
soil stabilization w/ permeation grouting @ edge of foundation footing. fssi soil stabilization plans job# 5533-24 dated 10/22/24. korbacher statement of planned operations dated 11/13/24. property owner consent letter dated 9/27/24. no exterior work | $7,500 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 822 31st Av | Foundation Soil Stabilization | permeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report)Details
permeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report) | $7,300 |
| Jul 12, 2023 | Completed final sign-off Oct 2023 | 16 05th Av | Eastwood Development Incorporated | revision to bpa#202306150189, to pull back grouting off property line by 1 footDetails
revision to bpa#202306150189, to pull back grouting off property line by 1 foot | |
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 16 05th Av | Eastwood Development Incorporated | permeation grouting of the soils along the existing foundation ref pa# 202010156594Details
permeation grouting of the soils along the existing foundation ref pa# 202010156594 | $7,000 |
| Nov 28, 2022 | Completed final sign-off Mar 2023 | 557 Duboce Av | Tn Building | soil stabilization of 557 duboce ave soil during work at 551 duboce. to comply with nov 202293109.Details
soil stabilization of 557 duboce ave soil during work at 551 duboce. to comply with nov 202293109. | $10,000 |