Bruno Korbmacher
- Listed as
- engineer
- On San Francisco permits
- Jan 2024 to Jul 2025
3 permits since 2000 (engineer on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 118 16th Av | Foundation Soil Stabilization | grouting of the soils along the existing foundation.Details
grouting of the soils along the existing foundation. | $7,862 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 130 16th Av | Foundation Soil Stabilization | obtain planning and building permit for permeation grouting of the soils along the existing foundation.Details
obtain planning and building permit for permeation grouting of the soils along the existing foundation. | $7,862 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 822 31st Av | Foundation Soil Stabilization | permeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report)Details
permeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report) | $7,300 |