Permit GraphShortlistSan Francisco building permits since 2000

Bruno Korbmacher

License
C045888
Look the license up with the state
Listed as
engineer
On San Francisco permits
Jan 2024 to Jul 2025

3 permits since 2000 (engineer on 3 permits): 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 2, 2025Completed
final sign-off Aug 2025
118 16th AvFoundation Soil Stabilizationgrouting of the soils along the existing foundation.
Details
Permit
202507020062
Status
complete
Filed
Jul 2, 2025
Permit issued
Jul 2, 2025
Final sign-off
Aug 1, 2025
Declared cost
$7,862
Address
118 16th Av

grouting of the soils along the existing foundation.

Open the permit page

$7,862
Jul 2, 2025Completed
final sign-off Aug 2025
130 16th AvFoundation Soil Stabilizationobtain planning and building permit for permeation grouting of the soils along the existing foundation.
Details
Permit
202507020059
Status
complete
Filed
Jul 2, 2025
Permit issued
Jul 2, 2025
Final sign-off
Aug 1, 2025
Declared cost
$7,862
Address
130 16th Av

obtain planning and building permit for permeation grouting of the soils along the existing foundation.

Open the permit page

$7,862
Jan 25, 2024Completed
final sign-off May 2024
822 31st AvFoundation Soil Stabilizationpermeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report)
Details
Permit
202401254587
Status
complete
Filed
Jan 25, 2024
Permit issued
Feb 16, 2024
Final sign-off
May 17, 2024
Declared cost
$7,300
Address
822 31st Av

permeation grouting of basement in preparation for future interior remodel. see attachements fssi soil stabilization plan, job #5483-23 (12/1/2023) divis consulting geotech report dated 8-17-21(soils report)

Open the permit page

$7,300