Bridgett Shank
- Listed as
- architect
- Firm
- Timbre Architecture
- Based in
- Berkeley
- On San Francisco permits
- Jan 2012 to Jun 2022
28 permits since 2000 (architect on 28 permits): 15 completed, 11 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2022 | Never finaled issued Oct 2022, no final | 575 Vermont St | 7x7 Construction | demolish a 1 story, no basement, detatched garageDetails
demolish a 1 story, no basement, detatched garage | $5,000 |
| Sep 24, 2021 | Completed final sign-off May 2022 | 935 Diamond St | Art Of Construction Inc | rev to pa# 201510220553; change in material for (e) interior stairwellDetails
rev to pa# 201510220553; change in material for (e) interior stairwell | |
| Jul 9, 2021 | Never finaled issued Jul 2021, no final | 1840 21st Av | Jimenez Construction Sf Inc | rev to 20160803 remove interior connection to storage alcove and add exterior door at deck.Details
rev to 20160803 remove interior connection to storage alcove and add exterior door at deck. | |
| Feb 9, 2021 | Expired or cancelled cancelled Jul 2024 | 549 Liberty St | remodel (e) 3rd fl & stair to 3rd fl includes (n) roofline @ rear. conversion of (e) 1st fl unconditional storage to (n) habitable space & garage, includes remodeled exterior entry stairs to accomodate (n) driveway. (n) mech, elec & plumb in area or work as notedDetails
remodel (e) 3rd fl & stair to 3rd fl includes (n) roofline @ rear. conversion of (e) 1st fl unconditional storage to (n) habitable space & garage, includes remodeled exterior entry stairs to accomodate (n) driveway. (n) mech, elec & plumb in area or work as noted | $180,000 | |
| Mar 12, 2020 | Completed final sign-off Aug 2020 | 554 Liberty St | Art Of Construction Inc | revision to permit #201704063344. update to entry stairs. replace terrazo steps w/wood, match siding at sides of steps.Details
revision to permit #201704063344. update to entry stairs. replace terrazo steps w/wood, match siding at sides of steps. | $3,000 |
| Jan 8, 2020 | Expired or cancelled cancelled Nov 2024 | 549 Liberty St | ext'r improvements - horizontal infill addition below (e) 2nd fl @ rear. kitchen & bath remodel & (n) stair to ground fl/basement. replace (e) kitchen windows. (n) mech, elec & plumbDetails
ext'r improvements - horizontal infill addition below (e) 2nd fl @ rear. kitchen & bath remodel & (n) stair to ground fl/basement. replace (e) kitchen windows. (n) mech, elec & plumb | $85,000 | |
| Dec 26, 2019 | Never finaled issued Oct 2022, no final | 575 Vermont St | Loughran Construction Inc. | erect a 3 stories, 2 dwelling plus 1 aduDetails
erect a 3 stories, 2 dwelling plus 1 adu | $400,000 |
| Mar 21, 2019 | Completed final sign-off Sep 2021 | 1911 33rd Av | Golden State Designs | interior remodel to (e) kitchen & bath; partial second story & minor rear addition at ground floor.Details
interior remodel to (e) kitchen & bath; partial second story & minor rear addition at ground floor. | $200,000 |
| Sep 28, 2017 | Completed final sign-off Apr 2019 | 1357 Alabama St | Jimenez Construction Sf Inc | remodel of (e) front entry & ground floor facade. seismic retrofit of (e) footing & foundation. replace (e) stucco & window at ground fl.Details
remodel of (e) front entry & ground floor facade. seismic retrofit of (e) footing & foundation. replace (e) stucco & window at ground fl. | $24,000 |
| Sep 28, 2017 | Completed final sign-off Feb 2018 | 935 Diamond St | Loughran Construction Inc. | revision to pa 2015-1022-0553 change (e) window & door locations and sizes at rearDetails
revision to pa 2015-1022-0553 change (e) window & door locations and sizes at rear | |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 554 Liberty St | Art Of Construction Inc | horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard.Details
horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard. | $200,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 1957 Beach St | moving a garage door forward approximately 2 feet; maher n/aDetails
moving a garage door forward approximately 2 feet; maher n/a | $5,000 | |
| Aug 3, 2016 | Never finaled issued Jul 2019, no final | 1840 21st Av | Jimenez Construction Sf Inc | remodel of an (e) single family residence; addition of a new internal staircase; bathroom remodel, facade finishes and addition of a new deckDetails
remodel of an (e) single family residence; addition of a new internal staircase; bathroom remodel, facade finishes and addition of a new deck | $40,000 |
| Jun 16, 2016 | Never finaled issued Jun 2016, no final | 1840 21st Av | interior renovation of an existing single family dwellings with infill at rear round level below habitable space, new office, flex room and bathroom at lower level.Details
interior renovation of an existing single family dwellings with infill at rear round level below habitable space, new office, flex room and bathroom at lower level. | $120,000 | |
| Oct 22, 2015 | Completed final sign-off May 2022 | 935 Diamond St | Loughran Construction Inc., Art Of Construction Inc | horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added.Details
horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added. | $200,000 |
| Sep 11, 2015 | Completed final sign-off Apr 2021 | 935 Diamond St | Loughran Construction Inc. | interior remodeling 1st & 2nd floors including (n) bathroom & bedroom & laundry @ 2nd floor, relocate bath, add new family room @ 1st floor. voluntary partial seismic bracing - monent frame.Details
interior remodeling 1st & 2nd floors including (n) bathroom & bedroom & laundry @ 2nd floor, relocate bath, add new family room @ 1st floor. voluntary partial seismic bracing - monent frame. | $70,000 |
| Jun 17, 2015 | Completed final sign-off Jul 2016 | 426 Monterey Bl | Jimenez Construction Sf Inc | an interior remodel of the kitchen, dining, living room, bathrooms, laundry and lower floor bedroom.Details
an interior remodel of the kitchen, dining, living room, bathrooms, laundry and lower floor bedroom. | $90,000 |
| Oct 20, 2014 | Completed final sign-off Feb 2016 | 672 Geary St | Diego Brothers Inc., Kitami | merge two existing b-occupancy retail spaces into one restaurant space. remove two non compliant restrooms & provide one new fully compliant restroom. provide new commercial kitchen. new grease exhaust vent permitted separately by owner/landlord. new bar & dining area; maher n/aDetails
merge two existing b-occupancy retail spaces into one restaurant space. remove two non compliant restrooms & provide one new fully compliant restroom. provide new commercial kitchen. new grease exhaust vent permitted separately by owner/landlord. new bar & dining area; maher n/a | $110,000 |
| Aug 21, 2014 | Never finaled issued Oct 2014, no final | 1157 Washington St | Clayton Timbrell & Co | revision to appl #2013.0122.8473 to remove the requirement for sprinkler system.Details
revision to appl #2013.0122.8473 to remove the requirement for sprinkler system. | |
| Aug 21, 2014 | Completed final sign-off Aug 2019 | 15 Hill St | this proj incl adding on to the rear of the bldg to allow for a new bedroom & bathroom & new vertical circulation to the ground floor for the lower unts, and new decks above.Details
this proj incl adding on to the rear of the bldg to allow for a new bedroom & bathroom & new vertical circulation to the ground floor for the lower unts, and new decks above. | $150,000 | |
| May 20, 2014 | Completed final sign-off Jul 2014 | 3280 22nd St | Loughran Construction Inc. | interior demo and tenant improvement of existing quick service food vendor under new ownershipDetails
interior demo and tenant improvement of existing quick service food vendor under new ownership | $11,500 |
| Sep 19, 2013 | Completed final sign-off Jun 2015 | 506 Foerster St | the proposed project includes reducing a two-car garage door to a single-car garage door & adding a new man-door at the garage of an existing sfd, & dryrot repair to windows on the second floor.Details
the proposed project includes reducing a two-car garage door to a single-car garage door & adding a new man-door at the garage of an existing sfd, & dryrot repair to windows on the second floor. | $10,000 | |
| Jan 22, 2013 | Never finaled issued Feb 2014, no final | 1157 Washington St | this project consists of: new floor area at 3rd floor. includes office, master bedroom, and one bathroom. addition of (2) windows and a pair of doors to existing roof deck.Details
this project consists of: new floor area at 3rd floor. includes office, master bedroom, and one bathroom. addition of (2) windows and a pair of doors to existing roof deck. | $95,000 | |
| Jul 3, 2012 | Completed final sign-off Aug 2012 | 5 Masonic Av | C D R Construction | replacement of the aluminum facesd on (1) double faced projecting sign with exposed neon tube. the sign shall be of the smae surface area as the existing neon sign but formed in a new circular shape with new neon tubes and fit on to the existing structure.Details
replacement of the aluminum facesd on (1) double faced projecting sign with exposed neon tube. the sign shall be of the smae surface area as the existing neon sign but formed in a new circular shape with new neon tubes and fit on to the existing structure. | $1,500 |
| Jul 3, 2012 | Never finaled issued Jul 2012, no final | 5 Masonic Av | C D R Construction | (2) non-sructural painted wall signDetails
(2) non-sructural painted wall sign | $100 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 1157 Washington St | Clayton Timbrell & Co | revision to 201201242750. change in stair designDetails
revision to 201201242750. change in stair design | |
| Jun 11, 2012 | Never finaled issued Jun 2012, no final | 5 Masonic Av | C D R Construction | revision to appl #2012.05.09.0098 - scope of work is limited to the revision of the accessibility checklist to represent the changes made to the restroom layout due to existing conditiona discovered during construction.Details
revision to appl #2012.05.09.0098 - scope of work is limited to the revision of the accessibility checklist to represent the changes made to the restroom layout due to existing conditiona discovered during construction. | |
| Jan 24, 2012 | Never finaled issued Apr 2012, no final | 1157 Washington St | Clayton Timbrell & Co | replace (e) roof with green roof, roof deck & perform related structural. interior & exterior finishes to be removed & replace aas needed, in kind. install hydronic heat system, replace 3 east facing windowsDetails
replace (e) roof with green roof, roof deck & perform related structural. interior & exterior finishes to be removed & replace aas needed, in kind. install hydronic heat system, replace 3 east facing windows | $60,000 |